Loading...
O-05501 ORDINANCE NO. S S AN ORDINANCE TO AMEND THE BUILDING CODE OF THE VILLAGE OF DEERFIELD, LAKE COUNTY, ILLINOIS, BY SPECIFY- ING CERTAIN FEES BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF DEERFIELD, LAKE "COUNTY, ILLINOIS: SECTION 1: That the Building Code of the Village of Deerfield adopted under date of May 14, 1916, as amended, be, and the same is hereby, further amended as follows: That Section 23, Regulations Adopted, Sub - section (e), Electrical Fees, be amended by striking out all of said Sub - section (e) and concurrently inserting in lieu thereof and in substitution thereof a new Sub - section (e) to be and read as follows: "(e) Electrical fees.) The fee for the approval of plans, inspections and tests for all electrical wiring and apparatus installation shall be as follows, provided that the electrical contractor shall deposit twice the estimated inspection fees with a minimum deposit of Ten Dollars ($10.00) from which the following inspection fees shall be deducted and the unused balance, if any, refunded upon final inspection: Base charge for light wiring or small motors..... x;1.50 Switches per Outlet ••••••••••••••••••..••.••....• �•05 Fixtures per outlet .............................. .05 Plug receptacles per outlet.... 005 Motors (-! (2 H.P. or over) 2 plus 5¢ a H.P......... 2.05 (One Horsepower equals 746 Watts) Heating devices, $2 plus 5¢ a H.P ................ 2.05 Lighting fixtures $1;,base charge 25¢ for each fixture ......... ............................... 1.00/ 25¢ for each fixture Wiring for electric signs @ $3 each ..... .. ..... .. 3.00" SECTION 2: That the Building Code of the Village of Deerfield adopted under date of May 14, 1946, as amended, be, and the same is hereby, further amended as follows: 0 - 2 - That Section 23, Regulations Adopted, of the Building :Code of the Village of Deerfield be amended by the addition of the new Sub - sections Q),(k),(1), to be and read as follows: "(j) Catch Basin Fees.) The fee for approving plans, inspections, and tests for catch basins shall be Five Dollars ($5.00) per each catch basin. rr(k) Septic Tank Fees.) The fee for the approval of plans, inspections, and tests of any septic tank shall. be Fifteen Dollars ($15-00) per septic tank. "(1) Demolition of Building Fees.) The fee for inspec- tion and surveillance of the demolition of buildings. shall be Ten Dollars ($10.0b) per building." SECTION 3: That all ordinances in conflict herewith are hereby revoked. PASSED this 10th day of April, 1950. AYES: Four NAYS: One APPROVED this 10th day of April, 1950. ATTEST: Village Clerk P—resMenT of the Board of Trustees of the Village of Deerfield, Illinois