O-12-20VILLAGE OF DEERFIELD LAKE AND COOK COUNTIES, ILLINOIS ORDINANCE NO. 0 -12 -20 AN ORDINANCE AMENDING SECTION 6 -6 ( "FEES ") AND SECTION 6 -79 ( "SCHEDULE OF CHAPTER 6 FEES, CHARGES AND RATES ") OF CHAPTER 6 ( "BUILDING ") OF THE MUNICIPAL CODE OF THE VILLAGE OF DEERFIELD WHEREAS, the Village of Deerfield is a home rule unit of local government pursuant to the provisions of Article VII, Section 6 of the Illinois Constitution of 1970; and WHEREAS, as a home rule unit of local government, the Village may exercise any power and perform any function pertaining to its government and affairs including, but not limited to, the power to regulate for the protection of the public health, safety, moral and welfare, to license, and to tax, except as limited by Article VII, Section 6 of the Illinois Constitution; and WHEREAS, the corporate authorities of the Village of Deerfield have determined that the demolition of existing buildings, the construction of new buildings and the renovation of existing buildings in the Village, including related site development activities ( "Construction Work "), place an additional demand on and serve to shorten the expected life span of the Village's capital facilities and infrastructure, including but not limited to streets, sidewalks, water mains, sanitary and storm sewers, overland drainage facilities, public trees and streetscape improvements by reason of, among things, increased vehicle traffic including heavy vehicles, street cuts, the compaction or loosening of soil, erosion, silting of catch basins, drains and pipes and the collapse or blockage of utility facilities; and WHEREAS, the depreciation of and damage done to public infrastructure as a result of Construction Work in the Village is in addition to the normal wear and tear imposed on public Page 1 of 8 infrastructure facilities; and WHEREAS, the depreciation of and damage done to public infrastructure facilities as a result of Construction Work is typically incremental in nature and often cannot be directly connected to a particular site or to particular building construction, demolition or site development activities; and WHEREAS, the corporate authorities of the Village of Deerfield have determined that it is in the public interest of the Village of Deerfield and the resident taxpayers of the Village of Deerfield that an infrastructure impact fee be charged at the rate of one -half percent (0.5 %) of the estimated cost of permitted Construction Work, and should be imposed and collected as an incident to the issuance of building permits for any building construction or demolition activity which requires a building permit under the Municipal Code of the Village of Deerfield at the rates set forth in this Ordinance, or at the rates as may hereafter be set forth in a future annual fee resolution adopted by the corporate authorities, the proceeds of which infrastructure impact fee shall be deposited in the Infrastructure Fund for the purpose of defraying the cost of future infrastructure improvements and repairs; NOW, THEREFORE, BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF DEERFIELD, LAKE AND COOK COUNTIES, ILLINOIS, in the exercise of its home rule powers, as follows: SECTION 1: That the above and foregoing recitals, being material to this Ordinance, are hereby incorporated and made a part of this Ordinance as if fully set forth herein. SECTION 2: That Section 6 -6 ( "Fees ") of Chapter 6 (Building) of the Municipal Code of the Village of Deerfield, as amended, be and the same is hereby further amended to read as follows (additions are indicated by underscoring and deletions are indicated by strikethFeugh Page 2 of 8 markings): Sec. 6 -6. Fees, Charges, Rates and Taxes: (a) No permit or amendment thereto shall be issued without the-fee being paid. The sehedule shall be as pFevided fOF in seetien 6 79 ef this ehaptef-. fees, charges, rates and taxes set forth in section 6 -79 of this chanter being paid (b) Any person granted a building permit or a demolition permit under the provisions of this chanter, who is not exempted from paving hermit fees under section 6-7 of this all pay an infrastructure impact fee at the rate se forth in section 6 -79 of this chanter, or the rate set forth in the Annual Fee Resolution as defined in this Code. The infrastructure impact fee imposed pursuant to this subsection shall be in addition to any building_ permit fee or demolition permit fee set forth in section 6 -79 of this chapter, The funds received by the Village shall be deposited in the Infrastructure Fund. Imposition of the infrastructure impact fee pursuant to this subsection shall not apply_ to any demolition or any building construction, renovation or remodeling for which -a complete and proper permit application was on file with the Village on or before June 1.2012. SECTION 3: That Section 6 -79 (Schedule of Fees, Charges and Rate) of Chapter 6 (Building) of the Municipal Code of the Village of Deerfield, as amended, be and the same is hereby further amended to read as follows (additions are indicated by underscoring and deletions are indicated by strikethreugk markings): 6 -79. Schedule of Chapter 6 Fees, Charges.,-a-d Rates and Taxes: Corresponding Section of the Description Amount Municipal Code Board of Building Appeals fee Construction permit fee for New Single Family and Two Family Residential Construction, per square foot area Frame Basement .080 Crawl Space .044 First floor .322 Second Floor .242 Third Floor .242 Garage Attached .080 $175.00 Brick/Veneer Brick/Mason .16 .16 .080 .080 .402 .482 .322 .322 .322 .322 .160 .242 Page 3 of 8 2 -140 6 -6 Garage Detached .160 .242 .322 Porch Open .242 .278 .278 Porch Enclosed .284 .322 .322 Construction permit fee for all types of Based on estimated cost of construction, 6 -6 construction other than new single - family $23.00 per $1,000 for the 1st $10,000 and two- family residential construction of estimated cost, and $17.20 per $1,000 for each $1,000 of estimated construction cost, or fraction thereof, thereafter Infrastructure lmoact Fee 0.5% of estimated cost of construction 5--6 and /or demolition Passenger, freight, hand elevators, power operated dumbwaiters, moving stairways or similar hoisting devices Initial certification Temporary use permit Semi - annual inspection, testing and certification Heating Permit for New Single Family and Two Family Residential Construction Inspection/Reinspection Fee Certificate of Occupancy /Compliance Inspection Residential construction plan review fee, based on estimated cost of construction up to $5,000 $5,001 to $15,000 $15,001 to $50,000 In excess of $50,000 Commercial construction plan review fee, based on estimated cost of construction up to $50,000 $50,001 to $100,000 $100,001 to $500,000 In excess of $500,000 Extension of building permit based on estimated construction cost per month of extension $30.00 $30.00 $30.00 $40.00 per 1,000 sq. ft. of living space $50.00 $50.00 Estimated Construction Cost = Fee $ 20.00 $ 50.00 $100.00 $150.00 $100.00 $200.00 $400.00 $600.00 $0.50 per $1,000 Permit to remove building or structure $1.00 per $1,000 to a different lot, based on the estimated value of the building or structure in its completed condition after removal to a new lot Page 4 of 8 6 -6 6 -6 6 -6 6 -6 6 -6 6 -6 6 -6 6 -6 6 -19(d) 6 -32(a) Relocation of a building or structure $4.00 per $1,000 6 -32(b) to a new location within the same lot, based on the estimated cost of moving, including new foundations work necessary to put the building or structure in a usable condition in its new location Fee for demolition of a building $100 for each 1,000 sq. ft. or fraction or structure of the gross area of the lot upon which 6 -33 the building or structure is located Swimming pool permit fee, based on the $23.00 per $1,000 of the 1" $10,000; 6 -51 estimated cost of the erection or construction $17.20 per $1,000 for each additional of the swimming pool $1,000, or fraction Electrical Permits 8 -4 Base electrical permit fee (each device $25.00 plus $1.00 for each electric used in an opening such as a switch, device opening receptacle, light fixture, motors of less than '/z hp and heating and other units of less than 100 watts is considered an outlet) Fixture installations $1.00 per fixture Heating and other installations (heating KVA fee = $1.00 and other units of 600 watts and larger only) Sign installations $4.00 per square foot New service /upgrade $75.00 Sewer Tapping/inspection fee Licensed Plumbing Inspector Consultant fee plus 15% (Independent Contractor) Single- family /sanitary connection and inspection Single- family /storm connection and inspection Commercial zoned property /sanitary connection and inspection Commercial zoned property/storm connection and inspection $300 connection /$50 inspection $200 connection /$50 inspection $1000 per acre connection fee $200 inspection fee $400 per acre connection fee $200 inspection fee Industrial, office and research zoned $1200 per acre connection fee property/sanitary connection industrial, office and research zoned $400 per acre connection fee property/storm connection Special use zoned property $1200 per acre connection fee sanitary connection Page 5 of 8 16 -5 Special use zoned property storm connection Multi- family zoned property/sanitary connection and inspection Multi- family zoned property/storm connection and inspection Residential driveway permit Commercial driveway permit Parkway and street excavation permits Parkway excavation deposit Opening a public street or alley And /or excavating or tunneling Deposit Fence Permit Tree preservation plan review: Demolition with no building permit Lot improvement (no demolition): Decks and patios Driveways Fences, sheds and accessory structures Irrigation systems Pools and tennis courts Room additions Lot redevelopment, with demolition Lot redevelopment, without demolition Ad hoc tree removal: $400 per acre connection fee $80 per unit connection fee $20per unit inspection fee $50 minimum $60 per unit connection fee $20 per unit inspection fee $50 minimum $50.00 19 -24(d) $100.00 deposit for each 10 -feet in driveway width, or fraction thereof $50.00 19 -24(c) $30.00 19 -31(a) 500.00 19 -31(b) $1,000.00 19 -31(c) $1,000.00 Deposit plus $30 per sq. ft. of openings that are in excess of 4' x 4' $50.00 19 -62 $275.00 $140.00 $150.00 $125.00 $125.00 $195.00 $275.00 $525.00 $450.00 Permit application $75.00 Permit $125.00 Permit for dead, hazardous and nuisance trees $0.00 Cash tree replacement fee $125.00 per caliper inch Water permit, meter and connection fees: Meter Roundway "B" Box Cost of meter (F.O.B) plus 15% Cost of roundway (F.O.B) plus 15% Cost of `B" box (F.O.B) plus 15% Page 6 of 8 21 -29(c) 21 -31(c) 21 -34 23 -5 Corporation Cost of corporation (F.O.B) plus 15% Fittings Cost of fittings (F.O.B) plus 15% finch tap, 3/4 inch meter $125 tap fee; $80 future repair; $80 inspection. 1 inch tap, 3/4 inch ROM $125 tap fee; $80 future repair; $80 inspection. 1 inch tap, 1 inch meter $125 tap fee; $80 future repair; $80 inspection. 1 inch tap, 1 inch meter $125 tap fee; $80 future repair; $80 inspection. Iinch tap, 1 inch meter $125 tap fee; $80 future repair; $80 inspection. 1 inch tap, 1 inch meter $125 tap fee; $80 future repair; $80 inspection. Larger than 1 inch tap $125 tap fee; $150 future repair; $15 inspection. Commercial Tap fee $200 per acre (or faction), 23- 7(a)(1) plus $400 per inch of tap Industrial Tap fee $300 per acre (or faction), 23- 7(a)(1) plus $400 per inch of tap Air Condition System Permit Permit to install new $1.00 per ton of refrigerant. 23.26(a) Plus $20 Permit to alter /modify $1.00 per ton of refrigerant 23.26(a) plus $20 SECTION 4: That this Ordinance, and each of its terms, shall be the effective legislative act of a home rule municipality without regard to whether such Ordinance should: (a) contain terms contrary to the provisions of current or subsequent non - preemptive state law; or, (b) legislate in a manner or regarding a matter not delegated to municipalities by state law. It is the intent of the corporate authorities of the Village of Deerfield that to the extent that the terms of Page 7 of 8 this Ordinance should be inconsistent with any non - preemptive state law, this Ordinance shall supersede state law in that regard within its jurisdiction. SECTION 5: That this Ordinance shall be in full force and effect from and after its passage, approval and publication in pamphlet form as provided by law. PASSED this 7th day of May 2012. AYES: Benton, Farkas, Jester, Oppenheim, Seiden, Struthers (6) NAYS: None ABSENT: None ABSTAIN: None APPROVED this 7th day of May , 2012. ATTEST: la/�- i5lv 'llage Clerk Village P esident Page 8 of 8