Loading...
O-24-17VILLAGE OF DEERFIELD ORDINANCE NO. 2024- 0-24-17 AN ORDINANCE AMENDING SECTION 23-5 OF "THE MUNICIPAL CODE OF THE VILLAGE OF DEERFIELD, ILLINOIS, 1975," AS AMENDED, REGARDING WATER SERVICE WHEREAS, the Village has adopted water regulations to protect property owners from hazardous or faulty water practices ("Water Regulations'); and WHEREAS, the Village desires to amend the Water Regulations to increase the size of water services that are installed between the water main and the b-box to allow for more efficient upgrades to water service lines; and WHEREAS, the Village Board has determined that it will serve and be in the best interests of the Village and its residents to amend the Code pursuant to this Ordinance; NOW, THEREFORE, BE IT ORDAINED BY THE VILLAGE BOARD OF DEERFIELD, LAKE AND COOK COUNTIES, ILLINOIS, as follows: SECTION ONE: RECITALS. The foregoing recitals are incorporated into, and made a part of, this Ordinance as findings of the Village Board. SECTION TWO: AMENDMENT TO SECTION 23-5 OF THE VILLAGE CODE. Section 5, titled "Connection With Water Main; Permit; Fees; Charges," of Article 1, titled "In General," of Chapter 23, titled "Water," of the Village Code is hereby amended and shall read as follows: "Sec. 23-5. Connection With Water Main; Permit; Fees; Charges: No connection with a water main shall be made without a permit being issued and twenty four (24) hours' notice having been given to the director of public works. All such connections shall be made by the village. (a) Connection Fee And Charges: Connection fee and charges shall be as provided for in section 6-79 of this code in the amounts set forth in the annual fee resolution adopted by the corporate authorities. (b) Fixture Fee: A per fixture fee in the amount set forth in the annual fee resolution adopted by the corporate authorities shall be paid for each new plumbing fixture, installation or replacement in any new or existing buildings, including fixtures roughed in for fixture use. An inspection fee in the amount set forth in the annual fee resolution adopted by the corporate authorities shall be charged for inspection of plumbing. (c) Water Usage During Construction Period: There shall be a minimum charge in the amount set forth in the annual fee resolution adopted by the corporate authorities for water used during any construction of Additions are bold and double -underlined, A-1-A-m- are r t,uek +h.r,,..m� 1 4874-6061-5601, v. 2 single-family and two-family residences, buildings or structures in which the service is not metered. All other construction shall be metered and a temporary water meter hookup fee shall be paid in the amount set forth in the annual fee resolution adopted by the corporate authorities. "d Connection Reauirements• In addition to any other applicable requirements of this Code, whenever a new water service line is installed or an existing water service line is replaced or upgraded the portion of the water service line that is located between the water main and the b-box must be made out of a material approved by the Director of Public Works and Engineering and at least LE diameter. The Building Commissioner may require a copper water service with a diameter greater than 1.5 in -when reauired by other provisions of this Code or other applicable requirements of law." SECTION THREE: PUBLICATION. The Village Clerk is hereby directed to publish this Ordinance in pamphlet form pursuant to the Statutes of the State of Illinois. SECTION FOUR: EFFECTIVE DATE. This Ordinance will be in full force and effect after its passage and approval in the manner provided by law. AYES: Benton, Berg, Goldstone, Jacoby, Metts-Childers, Oppenheim NAYS: None ABSENT: None PASSED: April 1, 2024 APPROVED: April 1, 2024 ORDINANCE NO. 0-24-17 Daniel C' Shapiro, Mayor ATTEST: W- /i L Daniel Van Dusen, Deputy Village Clerk Additions are bold and double -underlined; deletions are ,.tvae . through. 2 - 4874-6061-5601, v. 2