Loading...
O-77-71ORDINANCE NO. 0--77- 71 AN ORDINANCE TO PROVIDE FOR A LOCAL IMPROVEMENT CONSISTING OF THE CONSTRUCTION OF CONCRETE PAVE- MENT, CURB AND GUTTER, STORM SEWER AND OTHERWISE IMPROVING KATES ROAD, IN THE VILLAGE OF DEERFIELDr ILLINOIS. BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF DEERFIELD, LAKE AND COOK COUNTIES, ILLINOIS: SECTION A local improvement shall be constructed in the ONE: Village of Deerfield, Illinois consisting of the construction of approximately 5,600 square yards of 8" standard reinforced portland concrete cement pavement on a 4" granular base, 2,835 linear feet of Illinois Standard Type B -6.18 curb.and gutter, 730 linear feet of Type.B -6.12 curb and gutter, 1113 linear feet of 12" reinforced concrete storm sewer, 422 linear feet of 10 ".reinforced concrete storm sewer, related traffic signal modifications, bituminous driveway repairs, and other necessary items, along the Kates Road right -of -way from Waukegan Road west to the right -of -way of the Chicago, Milwaukee, St. Paul & Pacific Railroad,.an approximate total distance of 1312 feet. All of said roadway is situated in the Village of Deerfield, Illinois. SECTION That said improvement shall be constructed, and TWO: the details concerning•the same shall be in accordance with the Plans and Special Provisions and specifications entitled "Village of Deerfield, Deerfield, Illinois, Kates Road Improvements- Special Assessment No. 114", attached hereto and made a part hereof. SECTION That all materials of every kind used in the THREE: construction of this improvement shall be of first class quality and suitable for the purpose for which they are to be used. 'All construction shall. be done in a workmanlike manner, under the supervision and subject to the approval of the Board of Local Improvements, and use shall be made of existing grades for roadway purposes. a � r SECTION That the Recommendation of the Board of Local FOUR: Improvements of this Village providing for this improvement, together with the Estimate of the cost thereof made by the President of said Board, both attached hereto, are herein approved. SECTION That the improvement herein provided to be FIVE: constructed shall be made, and the whole cost thereof including $19,538.93, being the amount included in the Estimate of the President of the Board of Local Improvements as the cost of making, levying, and collecting the assessment herein with an additional amount of $19,538.93 included as reserve for deficiency in interest, shall be paid for by special assessment in accordance with Article 9, Division 2, of the Illinois Municipal Code, approved May 29, 1961, and the amendments thereto; the provisions of which are hereby adopted by reference as the applicable provisions to be employed by this Village in regard to such local improvements. The sum of $19,538.93 shall be applied toward the cost of making, levying and collecting such assessment and an additional $19,538.93 shall be retained and used as reserve for payment of deficiency in interest. Each said amount does not itself exceed 6% of the amount of.the Assess- ment as estimated. SECTION The aggregate amount herein ordered to be assessed SIX: against the property, and also the assessment on each lot and parcel of land therein assessed, shall be divided into'ten (10) installments in the manner provided by the Statute aforesaid, and each of said installments shall bear interest at a rate.not to exceed 6% per annum according to law, until paid. SECTION That for the purpose of anticipating the collection SEVEN: of the second and succeeding installments of said assessment for said installments, vouchers or bonds. shall be issued, payable out of said installments bearing interest at a rate not to exceed 6% per annum, payable annually and signed by the President of the Village of Deerfield, and attested by the Village Clerk under the corporate seal of the Village of Deerfield. Said vouchers or bonds shall be issued in accordance with and shall in all respects conform to the provisions of the aforesaid statute.of the State of Illinois entitled, "Municipal Code" and the amendments thereto. -2- SECTION That the Village Attorney is directed to file EIGHT: a Petition in the Circuit Court of Lake County, Illinois, in the name of the Village of Deerfieldf praying that steps may be taken to levy a special assessment for said improvement in accordance with the provisions of this Ordinance in the manner prescribed by law. SECTION That all ordinances or part of ordinances NINE: in conflict herewith are, to the extent of such conflict, hereby repealed. SECTION That this Ordinance shall be in full force and TEN: effect from and after its passage and appzoyal as provided by law. AYES: Blumenthal, Gavin, Heisler, Marty, Seidman, Swanson (6) NAYS: None (0) ABSENT: None (0) PASSED this 7th day of- November j At D., 1977. APPROVED this 7th day of November , A. Dee 197.7 ATTEST: ilia V . ge C,;k 3 VILLAGE P RECOMMENDATION We submit herewith an Ordinance for a local improvement consisting of the construction of portland cement concrete pavement, curb and gutter, concrete storm sewer, and otherwise improving Kates Road in the Village of Deerfield, Lake and Cook Counties, Illinois, together with the Estimate of the costs of such improvement, which Ordinance and Estimate are hereto attached and made a part hereof, and we recommend the passage of said Ordinance and the making of the improvement contemplated therein. DATED: This 17th day of October 1977. PRESIDENT MEMBER MEMBEAj ,. iMEMBER EVA MEMBER ESTIMATE OF -THE PRESIDENT OF THE BOARD OF LOCAL IMPROVEMENTS OF THE VILLAGE OF DEERFIELD, ILLINOIS. SPECIAL ASSESSMENT NO. 114 TO THE BOARD OF LOCAL IMPROVEMENTS OF THE VILLAGE OF DEERFIELD, LAKE AND COOK COUNTIES, ILLINOIS, AS FOLLOWS: GENTLEMEN: I submit herewith the extent, nature, description and estimate of cost of a proposed improvement to be constructed under the Local Improvement Article of the Illinois Munici- pal Code of 1961, as amended.. The description of the improve- ment is as follows: The proposed work consists of the construction of approximately 5,600 square yards of 8" standard reinforced portland concrete cement pavement on a 4. granular base, 2,835 linear feet of Illinois Standard Type B -6.18 curb and gutter, 730 linear feet of Type B -6.12 curb and gutter, 1113 linear feet of 12" reinforced concrete storm sewer, 422 linear feet of 10" reinforced concrete storm sewer, related traffic signal modifications, bi- tuminous driveway repairs, and other necessary items, along.the Kates Road right -of -way from Waukegan Road west to the right -of -way of the Chicago, Milwaukee, St. Paul & Pacific Railroad, an approxi- mate total distance of 1312 feet. All of said road- way is situated in.the Village of Deerfield, Illinois. Said.improvement is to be constructed in accordance with Plans and Specifications designated and entitled "Village of Deerfield, Deerfield, Illinois, Kates Road Improvements, Special Assessment 114 ",.and the estimated costs.thereof includes engineering services, the costs of spreading and collecting the Assessment and legal-and reserve expenses. EST!71ATE OF OJA',TI TI ES 12 Relay existing 8" storm sewer pipe and connect to new manhole, complete in place,. including pipe., bedding and normal backfill LUMP $ 50.00$ 500.00 July 1 °77 Approx. Unit Total item Descriotion Quantity Price Amount 1 Earth Excavation 4230 CY $ 5.25 $22.207.50 2. Pavement removal and disposal 4188 SY $ 6.50 $27.222.00 3 Sidewalk removal and disposal 300 SF S 2.00 $ E00.00 4 Curb and gutter removal and disposal 555 LF $ 2.15 $ 1,193.25 5 Tree removal and disposal, 6 inches or more in diameter measured 2 feet above the ground 42' 1 $10.00 $ 420.70 6 .10" reinforced concrete storm sewer pipe, complete in place, including.pipe bedding and granular backfill to grade 422 LF $20.00 $ 8,440.00. 7 12" reinforced concrete storm sewer pipe, complete in place under pavement, including pipe bedding and granular backfill to grade 913 LF $24. 0 $21 0 .0 0 8. 12" reinforced concrete storm sewer pipe, complete in place in the parkway, including pipe bedding'and normal backfill 200 LF $16.30 $ 3,200.00 9 48" diameter standard manholes, complete in place, including all ..pipe connections and frame and grate 7 EA $6.00.00 $ 4,200.00 10 24 ",diameter standard inlets, complete in place, including all necessary pipe connections and frame and grate 7 EA $400.00 $ 2, 800.00 11 Concrete headwall for 12" pipe, r complete in place 1 EA $1500.00$ 1,500.00 12 Relay existing 8" storm sewer pipe and connect to new manhole, complete in place,. including pipe., bedding and normal backfill LUMP $ 50.00$ 500.00 Item 13 14 15 . 16 17 18 19 20 21 28 29 30 Oescription Fire hydrants to be moved Frame and grate adjustment Sub -base granular material, Type A, for fill and necessary over - excavations Type B -6.18 curb and gutter, complete in place Type B -6.12 curb and gutter, .Complete in place 8 standard reinforced P.C.C. pavement, complete in place, including pavement fabric and 4" thick crushed limestone base 3" N.T.B. pavement, complete in place, including 9" B.A.M. base P.C.C. sidewalk, complete in place Lawn restoration with sod, complete in place, including a minimum of 3" fine topsoil GALVS CON T 1k" GALVS CON T 2" GALVS CON T 2" . ELCBL C #6 2C'. ELCBL C #12 2C ELCBL C #12 5C MA ASY & 19'9" P TYP A 25' IND LOOP DET W /TIME,DELAY RELAY DET LOOP rA vt G Approx.. Unit Total Quantity Price Amount 1 EA $ 1.000 $-1,00 .0.0 4. EA $ 200.00 $ 300.00 2114 CY $ 15.00 $ 31,710.00 2835 LF $ 8.00 $ 22,680:00 730 LF $ 7.00$ 5,100.00 5600 SY $ 16.00$ 89,600.00 1090 SY $ 15.00$ 16,350.0C 100 SF $2.50$ 250.0( LUMP 22 - . 23 "- 24 35 LF 25 215.2 26 8.80$_149.6 27 28 29 30 Oescription Fire hydrants to be moved Frame and grate adjustment Sub -base granular material, Type A, for fill and necessary over - excavations Type B -6.18 curb and gutter, complete in place Type B -6.12 curb and gutter, .Complete in place 8 standard reinforced P.C.C. pavement, complete in place, including pavement fabric and 4" thick crushed limestone base 3" N.T.B. pavement, complete in place, including 9" B.A.M. base P.C.C. sidewalk, complete in place Lawn restoration with sod, complete in place, including a minimum of 3" fine topsoil GALVS CON T 1k" GALVS CON T 2" GALVS CON T 2" . ELCBL C #6 2C'. ELCBL C #12 2C ELCBL C #12 5C MA ASY & 19'9" P TYP A 25' IND LOOP DET W /TIME,DELAY RELAY DET LOOP rA vt G Approx.. Unit Total Quantity Price Amount 1 EA $ 1.000 $-1,00 .0.0 4. EA $ 200.00 $ 300.00 2114 CY $ 15.00 $ 31,710.00 2835 LF $ 8.00 $ 22,680:00 730 LF $ 7.00$ 5,100.00 5600 SY $ 16.00$ 89,600.00 1090 SY $ 15.00$ 16,350.0C 100 SF $2.50$ 250.0( LUMP $10,000 $ 101000.0( 52 LF' $ 5.50$ 286.0' 35 LF $ 6.15$ 215.2 17 LF 8.80$_149.6 60 LF- $ 2.50$ 150.0 140 LF $ --1.60$ '224.0 45 LF $ • 2.50$ • 112..5 1 EA $ 2.300 $ 2,300.0 1. EA $, 00 $ 300.0 112 LF $„ 1 ?_00$ 1.344.0 Item Description 31 PUL & RE ELCBL FR CON 32 REL .EX TS HD 33 REL EX TS HD & POST 34 35 36 37 38 39 40 41 42 43 44 REM EX MA P C FD TY A C FD 24" D HANDHOLE TRENCH .& BACKFILL PVMT MARKING PAINT WHITE 4" PVMT MARKING PAINT WHITE 24" It PVMT MARKING PAINT YELLOW 4 PVMT MARKING PAINT YELLOW 12" PVMT MARKING PAINT WHITE ARROWS AND LEGEND Traffic Control Approx. Quantity LUMP 1 EA 1 EA 1 EA 1 EA 1 EA 1 EA 69 LF 335 LF 33 LF 2660 LF 38 LF U n i t Total Price Amount $ 100.00$ 100.00 $ 75.0 CS 75.00 $ 125.0 1 125.00 $ 300.0($ 300.00 $ 300.0($ 300.00 $ 525.0% 525.00. $ 350.03 350.00 $ 2.25$ 155.25 $ 0.25$ 83.75 $ 1.0.0$ 33.00 $ 0.25$ 665.00 $ 0.60$ 22.80 108 SF $ - 1.50$ 162.00 • LUMP $3,530 $ 31500.00 TOTAL CONSTRUCTION $283,172.90 CERTIFICATE I hereby certify that, in my opinion, the foregoing Estimate does not exceed the probable cost of the proposed improvement and all lawful costs and expenses attending the same as provided by law. /pl / -3rcn1F.C.Q :20C <Pll PRESIDENT, BOARD OF LOCAL IMPROVEMENTS, DEERFIELD, ILLINOIS STATE OF ILLINOIS ) SS COUNTY OF L A K E ) AFFIDAVIT OF MAILING NOTICE OF PUBLIC HEARING �ai•MLS S%KA , being first duly sworn, on oath states that following a careful examination of the books of the Collector of Lake County showing the payment of general taxes during the last preceding year in which taxes were paid thereon to ascertain the person or persons who last paid the taxes on the respective lots, tracts, and parcels of land fronting on the improvement described in a NOTICE OF PUBLIC HEARING attached hereto, he did, on the S*.q' day of October, 1977, send such NOTICE OF PUBLIC HEARING, a copy of which is attached hereto, by first -class mail, postage prepaid, directed to the persons who paid the general taxes for the last preceding year on each lot, tract or parcel of land fronting on the improvement described ir. SUBSCRIBED and SWORN to before this of October, 1977. tary Public VILLAGE OF DEERFIELD, ILLINOIS SPECIAL ASSESSMENT NO. 114 NOTICE OF PUBLIC HEARING YOU ARE HEREBY NOTIFIED that the Board of Local Improve- ments of the Village of Deerfield, Illinois, at a meeting held the 3rd day of October, 1977, adopted a Resolution that a local improvement be made in the Village of Deerfield which Resolution provided in substance as follows: _ A local improvement is originated in the Village of Deerfield, Illinois consisting of the construc- tion of approximately 5,600 square yards of 8" standard reinforced portland concrete cement pavement on a 4" granular base, 2,835 linear feet of Illinois Standard Type B -6.18 curb and gutter, 730 linear feet of Type B -6.12 curb and gutter, 1113 linear feet of 12" reinforced concrete storm sewer, 422 linear feet of 10" reinforced concrete storm sewer, related traffic signal modifications, bitu- minous driveway repairs, and other necessary items, along the Kates Road right -of -way from Waukegan Road west to the right -of -way of the Chicago, Milwaukee, St. Paul & Pacific Railroad, an approxi- mate total distance of 1312 feet. All of said roadway is situated in the Village of Deerfield, Illinois. Attached hereto and incorporated herein by reference is an estimate of the cost of the proposed improvement. YOU ARE FURTHER NOTIFIED that the Board of Local Improvements has fixed the 13th day of October, 1977, at 8:00 P.M.,at the Village Hall, Deerfield, Illinois, as the time and place for public consideration of the proposed improvement. The extent, nature, kind, character and the estimated cost of the proposed improvement may be changed by the Board of Local Improvements at the public consideration thereof, as provided by law. All persons so desiring will then be heard as to the necessity, nature and cost of the proposed improvement, and, if upon hearing, the Board of Local Improvements shall deem such improvements desirable, it will adopt a Resolution and prepare and submit an Ordinance therefor, together with its Recommendation for passage as provided by law. DATED: The 4th day of October, 1977, BOARD OF LOCAL IMPROVEMENTS VILLAGE OF DEERFIELD, ILLINOIS, By: s/ Catherine B, Price Secretary @I ESTIMATE OF THE PRESIDENT OF THE BOARD OF LOCAL IMPROVEMENTS OF THE VILLAGE OF DEERFIELD, ILLINOIS SPECIAL ASSESSMENT NO. 114 TO THE BOARD OF LOCAL IMPROVEMENTS OF THE VILLAGE OF DEERFIELD, LAKE AND COOK COUNTIES, ILLINOIS, AS FOLLOWS: GENTLEMEN: I submit herewith the extent, nature, description and estimate of cost of a proposed improvement to be constructed under the Local Improvement Article of the Illinois Munici- pal Code of 1961, as amended. The description of the improve- ment is as follows: The proposed work consists of the construction of approximately 5,600 square yards of 8" standard reinforced portland concrete cement pavement on a 4" granular base, 2,835 linear feet of Illinois Standard Type B -6.18 curb and gutter, 730 linear feet of Type B -6.12 curb and gutter, 1113 linear feet of 12" reinforced concrete storm sewer, 422 linear feet of 10" reinforced concrete storm sewer, related traffic signal modifications, bi- tuminous driveway repairs, and other necessary items, along the Kates Road right -of -way from Waukegan Road west to the right -of -way of the Chicago, Milwaukee, St. Paul & Pacific Railroad, an approxi -. mate total distance of 1312 feet. All of said road- way is situated in the Village of Deerfield, Illinois. Said improvement is to be constructed in accordance with Plans and Specifications designated and entitled "Village of Deerfield, Deerfield, Illinois, Kates Road Improvements, Special Assessment 114 ", and the estimated costs thereof includes engineering services, the costs of spreading and collecting the Assessment and legal and reserve expenses. ESTI�.IATE OF QUVJITIES July 1977 ' Approx. Unit Total Item Descriotion guantity Price Amount 1 Earth Excavation 4230 CY $ 5.25 $22,207.50 2 Pavement removal and disp'osal 4188 SY $ 6.50 $27,222.00 3 Sidewalk removal and disposal 300 SF $ 2.00 $ E00.00 4 Curb and gutter removal and disposal 555 LF $ 2.15 $ 1,193.25 5 Tree removal and disposal, 6 inches or more in diameter measured 2 feet above the ground 42 IM $10.00 $ 420.00 6 .10" reinforced concrete storm sewer pipe, complete in place, including pipe bedding and granular backfill to grade 422 LF $20.00 $ 8,440.00 7 12" reinforced concrete storm sewer pipe, complete in place under pavement, including pipe bedding and granular backfill to gra�!e 913 LF $24.0,0 $21,912.00 8. 12" reinforced concrete storm sewer pipe, complete in place in the parkway, including pipe bedding and normal backfill 200 LF $16.00 $ 3,200.00 9 48" diameter standard manholes, complete in place, including all pipe connections and frame and grate 7 EA $600.00 $ 4,200.00 10 24" diameter standard inlets, complete in place, including all necessary pipe connections and frame and grate 7 EA $400.00 $ 2,800.00 11 Concrete headwall for 12" pipe, complete in place 1 EA $1500.00$ 1,500.00 12 Relay existing 8" storm sewer pipe and connect to new manhole, complete in place,. including pipe. bedding and normal backfill LUMP $ 500.00$ 500.00 a, Approx. Quantity 1 EA 4 EA 2114 CY 2835 LF 730 LF 5600 SY 1090 SY 100 SF LUMP 52 LF 35 LF 17 LF 60 LF 140 LF 45 LF 1 EA 1 EA 112 Lf Unit Total Price Amount $_1,000 $ 1,000.00 $ 200.00 $ 300.00 $ 15.00 $ 31,710.00 $ 8.00$ 22,680.00 $ 7.00$ 5,100.00 $ 16.00$ 89,600.00 $ 15.00$ 16,350.00 $ 2.50$ 250.00 9 $10,000 $ 10,000.00 $ 5.50$ 286.0'3 Item Description 13 Fire hydrants to be moved 14 Frame and grate adjustment 15 Sub -base granular material, $_ 2.50$ Type A, for fill and necessary $ -2.3Q0 $ 2.300.00 over- excavations 16 Type B -6.18 curb and gutter, complete in place 17 Type B -6.12 curb and gutter, complete in place 18 8" standard reinforced P.C.C. pavement, complete in place, including pavement fabric and 4" thick crushed limestone base 19 3" H.T.B. pavement, complete in place, including 9" B.A.M. base 20 P.C.C. sidewalk, complete in place 21 Lawn restoration with sod, complete in place, including a minimum of 3" fine topsoil 22 GALVS CON T 112-" 23 GALVS CON T 2" 24 GALVS CON T 211 25 ELCBL C #6 2C 26 ELCBL C #12 2C 27 ELCBL C #12 5C 28 MA ASY & 1919" P TYP A 25' 29 IND LOOP DET W /TIME,DELAY RELAY 30 DET LOOP a, Approx. Quantity 1 EA 4 EA 2114 CY 2835 LF 730 LF 5600 SY 1090 SY 100 SF LUMP 52 LF 35 LF 17 LF 60 LF 140 LF 45 LF 1 EA 1 EA 112 Lf Unit Total Price Amount $_1,000 $ 1,000.00 $ 200.00 $ 300.00 $ 15.00 $ 31,710.00 $ 8.00$ 22,680.00 $ 7.00$ 5,100.00 $ 16.00$ 89,600.00 $ 15.00$ 16,350.00 $ 2.50$ 250.00 9 $10,000 $ 10,000.00 $ 5.50$ 286.0'3 $06.15$ 215.25 $® 8.80$ 149.60 $2.®50$ 150.00 $1.60$ 224.00 $_ 2.50$ 112.50 $ -2.3Q0 $ 2.300.00 $_3Q0 $ 300.00 $_LL OO$ 1, 344.00 Item n Descri tio — p Approx. uantit Unit Total Price Amount 31 PUL & RE ELCBL FR CON LUMP $ 100.00$ 100.00 32 REL EX TS HD 1 EA $ 75.0($ 75.00 33 REL EX TS HD & POST 1 EA $ 125.00$ 125.00 34 REM EX MA P 1 EA $ 300.0($ 300.00 35 C FD TY .A 1 EA $ 300.0($ 300.00 36 C FD 24" D 1 EA $ 525.0($ 525.00 37 HANDHOLE 1 EA $ 350.03 350.00 38 TRENCH & BACKFILL 69 LF $ 2.25$ 155.25 39 PVMT MARKING PAINT WHITE 4" 335 LF $ 0.25$ 83.75 40 PVMT MARKING PAINT WHITE 24" 33 LF $ 1.00$ 33.00 41 PVMT MARKING PAINT YELLOW 4 ". 2660 LF $ 0.25$ 665.00 42 PVMT MARKING PAINT YELLOW 12" 38 LF $ 0.60$ 22.80 43 PVMT MARKING PAINT WHITE ARROWS AND LEGEND 108 SF $ 1.50$ 162.00 44 Traffic Control LUMP $3 500 3 �o $ ,500.0., TOTAL CONSTRUCTION $283,172.90 Engineering Inspection, Testing and Contingencies (15%) $ 42,475.94 TOTAL CONSTRUCTION AND ENGINEERING $325,648.84 Legal Costs (6 %) 19,538.93 Reserve Deficiency (6 %) 19,538.93 PROJECT TOTAL $364.726.70