The undersigned hereby certifies that he is the duly appointed Deputy Village Clerk of the Village of
Deerfield, Lake and Cook Counties, Illinois, and that the attached is a true and accurate copy of
0-23-19 An Ordinance Approving Amendments to the Special Use and a Master
Plan for Tennaqua Swim and Racquet Club (1 Tennaqua Lane)
Dated this July 21, 2023.
OF 0 jI
•p 09•F,Q'�i z
�• �- -
SEAL
��,�•-•--- ••.`moo,.
SEAL
&-I;L,L
DANIEL VAN DUSEN
Deputy Village Clerk
Prepared by and after recording return to:
Daniel Van Dusen
Village of Deerfield
850 Waukegan Road
Deerfield, IL 60015
850 WAUKEGAN ROAD DEERFIELD, ILLINOIS 60015 TELEPHONE 847.945.5000 FAX 847.945.0214
Phase 1 Project Scope:-Completed 2020
-Complete renovation of the tennis courts and surfaces.
-New centralized pavilion and tree garden between courts 5 &6.
-LED Lights added to courts 3 &4 ;lights on courts 1 &2 replaced with LED's.
-Addition of Pickleball Courts 1,2 &3.
•Improved site drainage.
Phase 2 Project Scope:-Completed 2022
-Added paddle courts 5 and 6 with viewing deck and fire pit between new and existing.
-Remove existing garage and part of existing berm to provide room for new courts.
Next Projects Over Multiple Phases:(Projects subject to minor revisions)
-Add pickleball courts 4 ,5 &6.and new LED lighting for Courts 1-6 .
-Add pickbleball courts 7-10.
-Complete renovation of the main pool and expanding the pool deck with better cabanas,pool
furniture,landscaping;existing tot pool to remain as is .
•Expand the paddle deck with an open pavilion,including a fireplace.This deck will overlook
the pool area.This pavilion may be screened.
Next Projects (continued):
-Add two bocce courts between the pool and the existing paddle courts.
-Add new lighted path connecting the clubhouse to the bocce courts and the paddle deck pavilion.
-New picnic area and tot playground behind the clubhouse next to tot pool;will require further removal of
existing berm.
-Replace existing clubhouse with new structure that will be 150%larger and will include:
-Dedicated tennis locker rooms with showers.
-Pro shop,business and fitness offices.
-Better designed grill with walk-up windows from the pool deck .
-Inside dining area.
-Small workout facility and fitness classroom.
-Covered porches on the north,east and south sides of the clubhouse.
-Air conditioning so it can be open and used year-round.
-Expanded parking and additional landscaping.
The current projected timeline is 7 more years.With the support of our members,creative fundraising and
continued growth in membership we hope to speed up the time table.
ecr
43 Scum V«M Avenue
Mogeoo Mights.Ihros 00006
Job No 16043 03073
Yellow buildings are new structures.Orange/pink buildings are existing structures that remain.Tennaqua
Deerfield.IL
March 30r,2023 UOMHCT*•MC
43 SOUTH VAIL AVENUE
ARLINGTON HEIGHTS, IL 60005
P 847.392.9200
F 847.392.9009
March 9, 2018
Revised April 10, 2023
Plan Commission Submittal
Amending the Existing Special Use
For
Tennaqua
One Tennaqua Lane
Deerfield, Illinois
Tennaqua is a private equity, family-oriented club founded in 1958. In 2018, we
approached the village about updating our aging buildings and infrastructure to
address falling membership at the club. With the approval of that plan, our equity
membership has increased nearly 50% from 170 to 243 full memberships; As with
our previous plan, the maximum allowed membership by charter is 270 families and
that remains unchanged. Full membership was achieved in the 60’s and 70’s with a
waiting list and we are close to achieving this goal once again.
Tennaqua is evaluating the condition the existing facilities and the desired
improvements and enhancements to the club. The long-range planning committee
has established a master plan outlining the various improvements desired, as well as
the necessary renovation or replacement of the existing structures on the grounds.
These various improvements will enable the club to maintain viability well into the
future.
As we articulated in the past, the Master Plan is considered in phases to address
cost concerns. We are funding 100% of our activities through regular capital
assessments through 2030 in order to keep the financial requirements on our
membership affordable, instead of a single special assessment. The implementation
order of these phases is constantly being assessed and subject to fundraising and
economic conditions. The Master Plan consists of the following items:
1. Renovating the four existing Har-Tru (clay) tennis courts, two of which (courts 1
& 2) are currently lighted. There will be no change to the existing 10’-0” tennis
court fencing – Completed in Phase 1, 2020.
2. Add lights to courts 3 and 4, replace all of the existing light fixtures on courts 1
and 2 to match the new fixtures. The existing light poles on courts 1 and 2 are
brown and 30 feet high; the new poles will match the existing. Fixture
information (600W LED) - Completed in Phase 1, 2020.
3. Provide viewing/resting areas east of courts 1 and 3 and add trees and
enhance the landscaping along the adjacent path - Completed in Phase 1,
2020.
4. Relocate courts 5 and 6 (coated asphalt) and replace them with Har-Tru courts.
The relocated court 5 is 81’-4”± from the east property line. The new fencing
43 SOUTH VAIL AVENUE
ARLINGTON HEIGHTS, IL 60005
P 847.392.9200
F 847.392.9009
required to enclose the tennis courts will match the existing 10’-0” tennis court
fencing - Completed in Phase 1, 2020.
5. Provide a tennis pavilion (25’ x 37’) between the relocated courts 5 and 6
adding trees and landscaping in this area. The pavilion is a roofed shelter, slab
on grade and open on all sides. The height to the ridge of the pavilion from
grade is 20’-4”± - Completed in Phase 1, 2020.
6. Remove four existing coated asphalt courts (7 thru 10) and replace with Har-
Tru courts, in the same location. Court 7, the east most court is 36’-8”± from
the east property line, no change. There will be no change to the existing 10’-0”
tennis court fencing - Completed in Phase 1, 2020.
7. Install three Pickleball courts, fence enclosed, between the west side of the
tennis courts and the highway sound wall on the west property line. The fence
will be vinyl coated chain link to match the existing fencing around the tennis
courts - Completed in Phase 1.
We are proposing to ultimately increase the number of Pickleball courts
from three to ten, with vinyl coated chain link fencing to match the
existing fencing. Three courts will be added in PHASE 3, the next phase.
We also propose to add LED lighting to six courts (three existing and
three new) in PHASE 3. The light poles will be brown and 24 feet high the
fixtures will be LED’s similar to those on the existing tennis courts but
518W. Courts 7, 8, 9 & 10 (with no lights) would be in a future phase -
PROPOSED MODIFICATION TO THE CURRENT APPROVED MASTER
PLAN.
8. Provide for future parking north of courts 7 thru 10, a double loaded drive
with 90-degree parking for 48 cars (previously approved 24 cars). This
area is screened to the north with existing trees and heavy brush -
PROPOSED MODIFICATION TO THE CURRENT APPROVED MASTER
PLAN.
9. Provide lights, two poles, on the existing Sport Court. The poles will be on the
east side of the court with the fixture facing away from the neighboring homes
to the east. The light poles will be brown and 20 feet high with shrouds to
prevent light spillage onto the adjacent properties. The fixtures will be LED’s
similar to those shown for the tennis courts (attached) but 240W. The poles
will be 74’-0”± from the east property line - Completed in Phase 1, 2020.
10. Provide for future parking north of the Sport Court and east of the Pool
Building, 80-degree parking for 21 cars. This future parking lot is shown on
exhibit 3, which shows the existing parking lot layout and the location of trees
adjacent to the future lot. No trees will be removed to add this future parking
lot.
11. Provide two additional paddle courts (platform tennis) west of existing courts 1
and 2, with a viewing area, these courts will have lights that match the lights on
the existing courts - Completed in Phase 2, 2022.
43 SOUTH VAIL AVENUE
ARLINGTON HEIGHTS, IL 60005
P 847.392.9200
F 847.392.9009
12. Expand the existing elevated deck between the pool and paddle lodge.
Provide a roofed shelter (25’ x 42’) on the paddle deck, open on all sides
(maybe screened) with an outdoor fireplace and grilling station, 160’-3”± from
the east property line. Note that the existing paddle lodge is 159’± from the
east property line. The height to the ridge of the shelter from the raised deck is
20’-4”±; the height from existing grade is 23’-4”±.
13. Provide two, Bocce’ courts between the pool and paddle court 1, west of the
expanded deck and shelter. This will require removing a portion of the existing
berm to the west that was the original sound barrier to the expressway before
the precast concrete sound wall was installed.
14. Replace the existing original L-shaped pool, pool deck, fencing, lighting,
cabanas and related infra-structure with a rectangular pool, pool deck, fencing,
lighting, cabanas and new related infra-structure. Expand the existing pool
deck 25 feet to the west (approximately 2,605 SF), see exhibits 1 & 2. The
fencing to enclose the pool will be similar to the existing fencing enclosing the
pool. The existing fencing (vinyl and steel) will be reused (if possible), -
PROPOSED MODIFICATION TO THE CURRENT APPROVED MASTER
PLAN.
15. Renovate the existing pool building as required to remove and replace the
existing pool infra-structure. The existing pool building is 119’-5”± from the
east property line, no change.
16. Renovate and upgrade the existing pool locker rooms in the existing pool
building.
17. Remove and replace the existing club house (2,610 SF) with a new club house
of approximately 6,490 SF with covered porches. The expanded club house
will include a larger dining/lounge area, pro shop, management office, kitchen,
fitness office, fitness areas and locker rooms. The club house floor will be
raised to the same elevation as the existing pool and tennis decks and the
entry sidewalk will be sloped to provide accessibility for the handicapped. The
architectural design will be “shingle style” similar to the existing paddle lodge.
A dumpster/trash enclosure will be added as part of the club house project.
18. Remove a portion of the existing berm to the west to allow for a picnic and
playground area west of the proposed clubhouse. Provide a lighted path from
the club house around the west side of the pool to the proposed Bocce’ courts
and shelter on the paddle deck. The lighting is proposed to be ‘string lights’
suspended from 9-foot poles.
The combined side yard (east and west) setback requirement is 25 feet (minimum
yard of 10 feet). The rear yard (south) setback requirement is 50 feet. The front yard
(north) setback is 30 feet.
The maximum lot coverage allowed is 35% of the lot area of 432,698.5 square feet
(9.93 acres) or 151,444.48 square feet. The existing lot coverage is 1.71% or 7,388
square feet. The ultimate proposed lot coverage is 3.04% or 13,160 square feet.
Our goal for this approval process is to have the updated Master Plan and all of its
elements approved in concept. As we decide to proceed with various elements of
43 SOUTH VAIL AVENUE
ARLINGTON HEIGHTS, IL 60005
P 847.392.9200
F 847.392.9009
the Master Plan, we would provide the additional detailed information necessary
such, as survey information (including trees), civil engineering, detailed landscape
and architectural drawings for permit as required. We envision the construction
happening in phases and that construction would start after Labor Day for each
phase and that the work would be substantially done by Memorial Day of the next
year. We propose that as long as our detailed plans are substantially the same (the
Village would determine substantially the same) as we are proposing now and meet
the requirements of the Village that the phase could be approved by staff
administrative review and building department review without going through the full
(5 month) public hearing and approval process.
The Tennaqua Board has established a tentative schedule of the proposed
improvements [subject to fund raising and financing] starting in the fall of each year
as follows:
• Year 1 [2018-20] - Tennis court renovations, court relocation, light two additional
courts, tennis pavilion and Pop tennis courts – Phase 1 Completed in 2020.
• Year 4 [2022] - Two additional paddle courts – Phase 2 Completed in 2022.
• Year 5 [2023-24] - Add three Pickleball courts – Proposed Phase 3.
• Year 7 [2025-26] - Pool renovation/expansion, bocce’ courts, pavilion overlooking
the pool/paddle area and path.
• Year 9 or 10 [2027-28 or 2028-29] - New clubhouse.
As the scope of each year’s work is further developed and budgeted, other planned
elements could be added or delayed to subsequent years.
Thank you for your consideration.
July 19
Master Plan Chair/Board Member President