Loading...
07/21/2008Approved 7-21-08 COW Page 1 of 2 MINUTES COMMITTEE OF THE WHOLE July 21, 2008 The Village Board met in the Board Room of the Village Hall at 8:20 p.m. on Monday, July 21, 2008. In attendance were: Village Board Staff Steve Harris, Mayor Kent Street, Village Manager Robert Benton, Trustee Phil Kiraly, Assistant Village Manager Michelle Feldman, Trustee Barbara Little, Director of Public Works & Engineering Thomas Jester, Trustee Robert Fialkowski, Director of Finance Harriet Rosenthal, Trustee Jim Bernahl, Assistant Village Engineer William Seiden, Trustee Brad Fink, Assistant Director of Public Works Barbara Struthers, Trustee Kendal Dean, Administrative Intern Design Review – Deerfield Road Pedestrian Underpass Ms. Little introduced Rick Young and Fritz Hengge of McDonough Associates serving as our design engineers on the project to install a new 8 foot wide pedestrian underpass of the railroad along the south side of Deerfield Road. It was noted that this project had received 80% Federal and State funding approval, resulting in 20% for the Village. The project’s objectives are to improve pedestrian safety and accessibility to the Deerfield Train Station and the Village Center Business District. It was noted that the current pedestrian underpasses along either side of Deerfield Road are narrow, meeting the minimum standard for wheelchairs and comfortably only allow for one-way pedestrian use. Several aspects of the proposed underpass design were discussed, including its good visibility from Deerfield Road as well as the improved safety and convenience for Deerfield residents and visitors. The project would take several months to complete and would disrupt the use of the current pedestrian bridge requiring commuters to cross Deerfield Road at Chestnut or Robert York Avenue. It was agreed that the advantages for the project were significant and the outside funding opportunity reinforced its active pursuit at this time. A proposal from McDonough Associates will be submitted to the Village Board shortly to keep the project moving forward. Deerfield Road Sidewalk (South side from Rosemary to Eastern Limits) Ms. Little summarized the project and introduced Anthony Bryant, the design engineer for the project, who reviewed the existing site conditions and 4 alternatives for revisions of the sidewalk along the south side of Deerfield Road running east from Rosemary Terrace to the eastern Village limits by the Middle Fork bridge. The original concept design presented to adjoining neighbors last year was considered to be too intrusive into front yards and unnecessarily disruptive to trees and existing landscaping. As a result, a redesign was sought. The project’s current objectives are to increase sidewalk safety and usability by providing a wider sidewalk and increased separation from Deerfield Road, while also taking into consideration adjoining Approved 7-21-08 COW Page 2 of 2 property conditions, including landscaping and tree locations with the intention to minimize disruption and tree loss. After further discussion, it was the general consensus that Alternative 4 was preferred. It consists primarily of a 4 foot parkway and 5 foot sidewalk, with minimal off-setting curves for trees. Safety concerns with tree locations and curving the walkway were expressed for specific sidewalk segments. To further consider safety, landscaping impacts and other factors, it was agreed that the Board should meet on-site at 6:00 pm on August 4, 2008, to tour the walkway. Adjournment The meeting was adjourned at 9:50 p.m. following unanimous approval of the motion to adjourn made by Trustee Rosenthal and a second by Trustee Seiden. Minutes prepared by: _________________________________________ KENT S. STREET, Village Manager