Loading...
O-14-0910" Ballards (Typ.)BleachersB l e a c h e r s 31SPACES31SPACES31SPACES12SPACES38SPACES72SPACES37SPACES30SPACESSCOPE OF NEWCONSTRUCTIONEXISTING 2 STORYDEERFIELD HIGH SCHOOLW A U K E E G A N R O A DNORTH BRANCH OF THE CHICAGO RIVERVARSITY BASEBALL FIELD675SPACES15SPACES13SPACES21SPACES74SPACES26SPACES42SPACES50SPACES53SPACES22SPACES17SPACES9SPACES5SPACES637 TOTAL SPACES18 HC SPACESNEW TENNIS COURTSBLEACHERSPOSSIBLE MOBILEBLEACHER LOCATIONFOR TENNIS MATCHESFOOTBALL FIELDHIGH SCHOOL DRIVE100' WETLAND BUFFEREXISTING 2 STORYDEERFIELD HIGH SCHOOLEXISTING 2 STORYDEERFIELD HIGH SCHOOLSCOPE OF NEWCONSTRUCTIONPRIMARYATHLETIC ENTRYPRIMARYBUILDING ENTRYEXISTING TENNIS COURTSFINISH FLOOR ELEVATION 103.9'USGS ELEVATION 668.9'FINISH FLOOR ELEVATION 100'USGS ELEVATION 665'392' - 10 1/8"253' - 2 5/8"APPROXIMATE PROPERTY LINESURVEYEDPROPERTY LINE8SPACES01/2"1"2"Copyright © 2013 Perkins+Will3/19/2014 1:16:08 PMc:\temp\D113-DFHS_ARCH_dansereaus.rvt03/13/14PROPOSED SITE PLANTownship High School District 1131959 Waukegan RdDeerfield, IL 60015NORTH0240'120'60'30'Scale: 1" = 60'-0" SCOPE OF NEWCONSTRUCTIONEXISTING 2 STORYDEERFIELD HIGH SCHOOLW A U K E E G A N R O A D HIGH SCHOOL DRIVEEXISTING 2 STORYDEERFIELD HIGH SCHOOLSCOPE OF NEWCONSTRUCTIONWESTENTRYMAINBUILDINGENTRYEXISTING TENNIS COURTS35' - 1 7/8"28' - 5 7/8"30' - 0"30' - 0"30' - 0"30' - 0"PERKINSWILL+PROPOSED FRONT ENTRYDRIVESDeerfield High School1959 Waukegan RdDeerfield, IL 60015Township High School District 113CURRENT PARKING COUNT674 SPACESPARKING ELIMINATED37 SPACESFINAL PARKING COUNT637 SPACESASK-140313A VERSION 7PROJ #: 021804.000MARCH 13, 2014SCALE: 1"=80'NORTH Deerfield High School New PE Facilities –Proposed Site Plan (Feb 13th) Building Expansion Program Total Added Area 66,569 GSF Program includes new pool, lockers, gym and toilet rooms Total Lot Coverage 12.4% Maximum building height 32’ + HVAC Parking Totals Before Project Total: 674 spaces After Project Total:674 spaces Accessible Spaces:14 spaces 304’ 2 7/8” Deerfield High School New PE Facilities –Proposed Site Plan -Revised Building Expansion Program Total Added Area 66,569 GSF Program includes new pool, lockers, gym and toilet rooms Total Lot Coverage 12.4% Maximum building height 32’ + HVAC Parking Totals Before Project Total: 674 spaces After Project Total:636 spaces Accessible Spaces:14 spaces 304’ 2 7/8”304’ 2 7/8” Deerfield High School New PE Facilities –Proposed Site Plan -Revised AutoTurn Analysis Deerfield High School New PE Facilities –Revised West Entry Loop Deerfield High School New PE Facilities –Revised West Entry Loop Daily Inbound Traffic Flow Deerfield High School New PE Facilities –Revised West Entry Loop Daily Outbound Traffic Flow Deerfield High School New PE Facilities –Revised West Entry Loop After Hours Athletic Traffic Deerfield High School New PE Facilities –Revised West Entry Loop Revised Parking Totals Deerfield High School New PE Facilities –Proposed Partial First Floor Plan Deerfield High School New PE Facilities –Proposed Partial Second Floor Plan Deerfield High School New PE Facilities –Proposed Building Elevations Deerfield High School Proposed PE Addition Perspective looking North-East Deerfield High School Proposed PE Addition Perspective looking North-East Deerfield High School Proposed PE Addition Perspective looking East