Loading...
O-69-05ORDINANCE NO. .0 -69 - -5 AN ORDINANCE PROVIDING FOR THE IMPROVEMENT OF PORTIONS OF FAIRVIEW AVENUE, BIRCHWOOD AVENUE, KENMORE AVENUE, GORDON TERRACE, LAUREL AVENUE AND ROSEWOOD AVENUE, BY THE CONSTRUCTION OF PAVEMENT WITH INTEGRAL CURBING, SIDEWALKS, AND INCLUDING A DRAINAGE SYSTEM WHERE NECESSARY/ BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF DEERFIELD, LAKE AND COOK COUNTIES, ILLINOIS, AS FOLLOWS: SECTION That a local improvement shall be made in the ONE: Village of Deerfield, Lake and Cook Counties, Illinois, the nature, character, locality and description of which improvement is as follows: The construction of a non - reinforced Portland Cement Concrete pavement with an integral curb, Portland Cement Concrete sidewalk, together with the necessary drainage and other improvements of Fairview Avenue from the north edge of the existing pavement of County Line Road to a point 120 feet south of the south right -of -way line of Hackberry Road, Birchwood Avenue from the north edge of the existing pavement of County Line Road to a point 120 feet south of the south right - of -way line of Hackberry Road, Kenmore Avenue from a point 8 1/2 feet south of the south right -of -way line of Laurel Avenue to a point on the north right -of -way line of Rosewood Avenue, Gordon Terrace from a point 8 1/2 feet west of the west right -of -way line of Fairview Avenue to a point 8 1/2 feet east of the east right -of -way line of Fairview Avenue, Laurel Avenue and Rosewood Avenue, from the east edge of. the existing pavement on Wilmot Road to a point 8 1/2 feet east of the east right -of -way line of Fairview Avenue the construction of a thirty -three inch (33 ") storm sewer along Gordon Terrace beginning from a manhole to be located four feet (4') east of the west right -of -way line of Birchwood Avenue to an existing manhole located four feet (4') east of the west right -of -way line of Fairview Avenue, all in Section 32, Township 43 North, Range 12 East of the Third Principal Meridian in the Village of Deerfield, in Lake County, Illinois, including I � the cost of all labor and materials, the cost of engineering and inspection, and the cost of making, levying, and collecting the assessment as provided by law. SECTION Said improvement shall be constructed, and the TWO: details concerning the same shall be in accordance with the Plans entitled "Village of Deerfield Proposed Improvements for Hovland Subdivision -- Special Assessment Number 108 ", and the Specifications entitled "Specifications for Hovland Subdivision (Pavement) Special Assessment Number 108- - Deerfield, Illinois ", attached hereto and made a part hereof, and in accordance with the Standard Specifications for Road and Bridge Construction, prepared by the State of Illinois, Department of Public Works and Buildings, and adopted August 1, 1968, which Stan- dard Specifications are on file in the Office of the Village Clerk and are incorporated herein by reference, and made a part of this Ordinance. SECTION All materials of every kind used in the construc- THREE: tion of this improvement shall be of first -class quality and suitable for the purpose for which they are to be used. All construction shall be done in a workman- like manner, under the supervision, and subject to the approval of the Board of Local Improvements. SECTION The recommendation of the Board of Local FOUR: Improvements providing for the improvement and the estimated cost thereof, made by the President of the Board of Local Improvements both hereto attached and made a part thereof, be and the same are hereby approved. SECTION The said improvement shall be made and the whole FIVE: cost thereof, together with an amount not exceed- ing six per cent (6 %) of the estimated cost to-wit: TWENTY -TWO THOUSAND SEVEN HUNDRED FORTY -THREE and 47 /100ths ($22,743.47) DOLLARS, which is hereby provided for to apply towards the cost and expense of making, levying and collecting the special assessment and all other expenses allowed by law, being the amount included in the estimate therefor shall be paid by special assess- ment levied in accordance with Article 9, Division 2, Chapter 24, of the Illinois Revised Statutes, as amended, being an Act en- titled "Illinois Municipal Code ", approved May 29, 1961, together with all Amendatory and Supplemental Acts (excepting Article 9, Division 3). SECTION The aggregate amount herein ordered to be SIX: assessed to pay the cost of said improvement against the property and also the assessment on each lot and parcel of land herein assessed shall be dividdd into ten (10) installments in the manner provided by the statute in such case made and provided and each of said installments shall bear interest at the rate of six per cent (6 %) per annum, according to law until paid. SECTION For the purpose of anticipating the collection of SEVEN: the .second and succeeding installments of said assessment for the cost of said improvement, the Village shall issue bonds payable out of said installments, bearing interest at the rate of six per cent (6 %) per annum, payable annually, signed by the President and attested by the Clerk of said Village under the corporate seal. Said bonds shall be issued in accordance with, and shall in all respects conform to the provisions of Article 9, Division 2, Chapter 24, of the Illinois Revised Statutes, as amended, being an Act entitled "Illinois Municipal Code ", approved May 29, 1961, together with all Amendatory and Supplemental Acts (excepting Article 9, Division 3). SECTION The Village Attorney be and he is hereby directed EIGHT: to file a Petition in the Circuit Court of Lake County in the name of the Village praying that steps may be taken to levy a special assessment for said improve- ment, in accordance with the provisions of this Ordinance and in the manner prescribed by law. SECTION All ordinances, or parts of ordinances in - NINE.: conflict herewith, be and the same are hereby repealed. SECTION That this Ordinance shall be in full force and TEN: effect from and after its prepassage publication, passage and the approval thereof according to law. ' S AYES: FOUR (4) NAYS: PASS: ABSENT: NONE (0) ONE (1) ONE (1) PASSED THIS 17th d day o of M March , , A.D. 1 1969. APPROVED THIS 17th d day o of M March A A.D. 1969. ATTEST: -6 Pei—�L Cl Village Clerk Village President RECOMMENDATION BY THE BOARD OF LOCAL IMPROVEMENTS OF THE VILLAGE OF DEERFIELD, LAKE COUNTY, ILLINOIS, TO THE BOARD OF TRUSTEES OF THE SAID VILLAGE OF DEERFIELD, FOR THE PASSAGE OF AN ORDINANCE PROVIDING FOR A LOCAL IMPROVEMENT TO: President and Board of Trustees Village of Deerfield Lake County, Illinois .We herewith submit.an Ordinance for the making of a Local Improvement entitled as follows: `. AN ORDINANCE PROVIDING FOR THE TMPROVEMENT OF'PORTIONS OF FAIRVIEW AVENUE, BIRCHWOOD AVENUE, KENMORE AVENUE, GORDON TERRACE, LAUREL AVENUE AND ROSEWOOD AVENUE, BY THE CONSTRUCTION OF PAVEMENT.WITH INTEGRAL CURBING, SIDEWALKS, AND INCLUDING A DRAINAGE SYSTEM WHERE NECESSARY together with the Estimate-of the cost of said improvement which Ordinance and Estimate are hereto attached and made a part hereof, and we recommend the passage of said Ordinance and the making of the Improvement contimplated therein. Respectfully. submitted, Secretary Member'"" •' ESTIMATE January 15, 1969 TO THE BOARD OF I..00AL IMPROVEMENTS OF THE VILLAGE OF DEERFIELD LAKE .COUNTY, ILLINOIS V RE: HOVLAND SUBDIVISION: SPECIAL ASSESSMENT NO, 108 Gentlemen: I hereby submit an estimate of cost of constructing a non - reinforced Portland Cement Concrete pavement with an integral curb, Portland Cement Concrete, side:- . walk, together with the necessary drainage and other improvements of Fairview Avenue from the north edge of the existing pavement of County Line Road to a poin.t- 120 feet south of the south right- of -\vay line of Hackberry Road, Birchwood Avenue from the north edge of the cxistini, pavement of County Line Road to a point 120 feet south of the south ric,ht -of -way line of flackberry Road, Kenmore Avenuo from a point 8- 1 /2 feet south of the. south ri,ht -of -way line of Laurel Avenue to a point on the north righl -of -way line of Rosewood Avenue, Gordon Terraco from a point 8-1/2 feet west of the west. right -of -way line of Fairview Avenue to a. point 8- I /2 feet east of the east right -of -way line of Fairview Avenue, Laurel Avenue and Rosewood Avenue, from the east edge of the exist in pavement on Wilmot Road to a point 8-1/Z feet east of the cast right -of -way line of Fairview Avenuo the construction of a thirty -three inch (33 ") storm sewer a.lon�; Gordon Terrace beainninh from a manhole to he located four fret (4') east of the west right -of -way line of Birchwood Avenue to an existing manhole located four feet (4') cast of the west right -of -way line of Fairview Avenue, all in Section 32, Township 43 North, Range 12 East of the Thir (.l Principal Meridian in the Village of Deerfield, in Lakc County, Illinois, 'including the (_-ost of all labor and materials, the co§t of on, gin.vering and inspection, and the cost of making, levying, and collecting; the assessment as provided by l aw., The said non - reinforced Portland Cement Concretes pavement with an inte,ral curb shall have a 6 inch uniform thickness and shall be 27 feet in width measured back to back of curb. The said Portland Cement Concrete sidewalk al6ng both sides of said improvement shall have a uniform thickness 'of 4 inches and sl -gall be' 5 feet in width except that said sidewa -lk shall be 6 inches in thickness across existing driveways leading into adjoining lots. The drainage to properly drain the said improvement shall consist of the construction of concrete pipe connc•cted' to. ether to the proposed manholes, inlet catch basins, inlets and to the. existingr, storm sewers within the.said improvement area. The proposed improvement shall include clearinc, excavatinv, all borro%v, repairing the sub - grade, trenching and tunnelling,; removal of existing culverts, laying. of all storm sewer pipe, connection to the. existinli, manholes and sewer pipe, connection to all proposed manholes, inlet . catch basins, special manholes and inlets construction of standard manholes, inlet catch basins, and inlets, with cast iron frame and lids; . 1 1 includill" bacl.fillin,.< trenches with early ,. -.-.ruin the parkways or with (inn, -ranular agoregate where a troi ch rd? e is closor than 2 feet of till! bacl< of ,the coinbine(i curb anti -,utter or \,;here: trenches or space ontsi <le the walls of inlel-s, rnanholes, man hole eaten basins and special manholes aro within pavel.i lent, curb and cutter or drive- way and walk areas; -itl fbishing of the storm s<•wers and tan-ipinc and jetting of the ba.ckfili; the- cunstruction of Portland Cement Concrete Sidewalk and siclr;waik approaches; Ilie construction of crushed stone, biturninous and concr,,tc driveways nrcossary to be replaced-, the adjustments and reconstruction of existing manholes, catch basins, and %•alvr, vaults, the existiils; cast iron cover is to be used; the adjust- ment and movin't of fire hydrants; the removal of trees, the spreading of topsoil to a nlinill,urrl thickness of finches and re- se.edint4 and watering, within the parkwav; all curing of paving; and conlbined curb and ,oivtor; protection of all concrete wort: from .frost, rains, traffic, sun and wind; protection of all trees as clesi %nated by Enoincer and all existing improverriews; the repair and roplacement of existing improvumcnts where damaged; whether public or private; removal of al.l rubbish created by the construction of said improvement; removal of all surplus materials, excavated or otherwise; all en.-,i nee ring services, labor, materials, tools, equipment and incidental expenses no- ccssary to completely construct said pri�poscil hilprovement, all in the Villafte of Deerfield, Lake County, Illinois. The estimated cost of said improvement as herein stated including all lawful expenses attending the same; is the sum of Three Hundred Seventy Nine.,Tho,ttsand, .FiAy-Seven Dollars and .ninety two cents ($379,057.92). L • 'A. GRADING & PAVING 1. 21,400 cuhi,c yards of F:xcavalion for the Non - Rcinforced f'. C. C. Pavr_rnent with an integral curb, driveway replacement, the parkways., includini, the removal 1Z. cisposal of all earth• all sub - trading & compacting, furnishing & placinry of all borrow that may be required, placinc, of all fill, removal of all exisling pave- ment including, base & surface course F, curbs, & gutters, corrrbined curb rk g;uttcrs, driveways and the removal & disposal of all log, stumps, brush, trees under six (6 ")•inch diameter, veltietation, rubbish & other objection.n] matter complete in place at $1. 50 per cubic yard $ 32, 100.00 2. 29, 680 square yards of non - reinforced P, C. C, pave - ment 6" thick with integral curb, including longitudinal, transverse and expansion joints, , complete at $5. 00 per square yard . . . . . . . $148,400.00 3. 520 square yards bituminous concrete tiurface cmrrso, 3" compacted thickness, in place oil pozzvlanic base course. Said wearing surface shall be manufactured and laid in accordance with Section 44, Arts. 44. 1 to 44. l2 inclusive, entitled "liittu-ninous Concrete Dense- Graded Ao!4regate Typc Class I complete at $2. 00 per square yard. . . . . . . . . $ 1-,040.00 4. 520. square yards po•r.zolariic base course, 10" compacted thickness, in place raider bituminous surfacinc;, including spreading, levelinv,, compacting and priming complete at $3. 00 pe.r square yard . . . . . . . . , . . . . . . . $ 1, 560.00 5. 90,430 square feet of P„ C. C', sidewalk 4" thick and all materials, placing, finishing, backfilling and expansion joints, complete in place at $0. 60 per, square foot . . . . . . . . . . . . . . . . . . $ 54,258.'00 6. 3,440 square feet of F'. C. C. sidewalk 6" thick at all driveway approaches and 'for reconstruction of existing, P. C. C. driveways and all materials, placing, finishing, backfilling and expansion joints, complete 'in place at $0. 70 per square foot $ 2, 408. 00 r 8. 9. • '10. n r 1. square. yards of I,ituniinous concr(,te. surface 2. 3. 4. r 260 square. yards of I,ituniinous concr(,te. surface course, sub- cl.tss I- 11. 2" in compacted thickness and sub- base; granular material, Type I1, tirade 8 or 9, 8" compacted thick - ness, including placing, spreading, compact- in!,, &. leveling for reconstruction of existing like driveways; complete in place at $4. 00 :. per square yard $ 1, 040. 00 350 , . square yards of sub -base and surface granular material, Type P!, Grh(le 8 or 9, 8" compacted thickness, .including placing, spreadiiig., conipacting & leveling for recun- struction of exitaing like driveways; complete in place at $2.50 per square yard .. $ 875.00 24, 100 square yards of topsoil & seeding, spread and prepare topsoil, lightly compact to a, n►ininiwn thickness of 4 ", water and seed, complete at $0. 70 per square yard $ 16, 870.00 273 .. inches of diameter of various diameter trees from 6" and greater to I)c removed, includiAg all excavation, grubhine, limb 'rernoval,� ! removal of all stumps &. debris, removal of :. surplus excavation and filling; of j he resulting hole with approved. earth,'' co octc at $3.'00 `�. per inch diameter .. , •y ,,:.; . '. .. $ 819.00 . TOTAL;: $259,370.00' STORM SEWERS: 662. lineal feet of 33' inch storm sewer,.•C 76,.'• Class II, complete in'place at $1Z.00 per lineal foot . . . . . .. ' $ '7,944.00 10 lineal feet of 27 inch storm sewer, C 76, C las s II, complete in Place; at $10. 00 per lineal foot 100.00 50 lineal feet of 21 inch storm sewer C 76, Class III, complete in place'at .$9. 00' per li;nc.al foot , . . .. $ 4150.00 .345 lineal feet of 18 inch s.tor►n sewer, 'C 14, complete in place at $7.00 per lineal foot ; .. $ 2,415.00 1 5. 455 lineal feet of 18 inch storm sewer, C 76, C1 ass III, complete in place at $8.00 per ; lineal fout. ... . , $ 3, 640.00 6. 45 - lineal feet of 15 inch storm sewer, .0 76. ' . Class I11 complete in placd •at $7. 20 per lineal fout . ... $ • 324.00 '7: 355. ', lineal feet of 15 ,inch storm sewer, C 76, Class 11 complete in place at $7.00 per lineal foot . . ... . . . . •'. .. $ 2,485.00 8. 305 lineal feet of 15 inch storm sewer, C. 14, • Complete in place at -$6.00 per lineal-foot $ 1,830.00 9. 701 lineal feet of 12 inch storm sewer, C 140• complete' in p1ace at $5. 50'per lineal foot f $ . 3, 855. 50 10. 368 lineal feet of 12 inch storm sewer, C 76, Class III complete in place'at $6. 30 per __ -- lineal foot . . . '. . . . . :' $' 2,318.40 11.. 500. .. •'t lineal feet of 12 inch storm sewer, Class III, Inlet Connections; complete.in place at $6. 50 . per lineal foot . .. .� . .. $ ' 3.250.00 12. 1, 130 lineal feet of 10 inch storm sewer, Class III, `:• ;` Inlet Connections, complete in place at $6. 20 per lineal foot . $ 7, 006.'00 • 13. 2� : `..:', ' ` each, concrete inlets, 24 -inch I. D. , .5 inch wall thickness, on 4 -inch concrete foundation,'.:,'' including all labor and materials, excavation and removal of surplus materials, and Standard Fxane and Grate complete in place' ' : at $200. 00 each . . . ... . . . .. . . . . . $ : 5,800.00 . 14. 24 • : each, concrete inlet catch basins, 48 1 itch I. D. •. ' 3 5 -inch wall thickness, on 6 inch concrete foundation, with sumps as shown on the plans, " ' .including all labor and materials, excavatiop ' and removal of surplus material, and Standard ' -Frame and-Grate,'. complete in place,at $350_.00: each . .:', ... .." ` . .' ' .., :. • : ...::.; .. .... $ • 8,400.00 I t \ ' t 3 '.l \ l 'If •• .. } 15. -12 each, concrete manholes, 48 inch I. Di , 5 inch wall thickness, on. 6 inch concrete foundation with moulded inverts, including; all labor and urplus • ' ' materials, excavation and removal of surplus.'' material and Standard Frame and Cover, . • complete in. place at $300.,00 each' :.'. : ,.':. $ 3,600.00 ' TOTAL: $ 53, 417.90 _ - C. OTHER 1. 12 •: scats of street signs, furnish and install street sign units 'at all intersections as directed by : the engineer, street sign unit to consist of four street name signs, each two mounted back to ; ?� back, and the signs mounted on a pole; street :. sign units to be purchased'from Village; com- • plete including; all labor and materials at $50. 00. each . . . . . . . . . : .' . $ 600:00 a 2. .3 acts of street lights; furnish and install street ;I lights mounted on concrete poles at three loca- tions as directed.by the Engineer. Light shall cunform to the following: Jbslyn - J214- 540 -PX -1. : fcomplete with photocell and- each leg. fused; 6690/120 or 240 V, Bulbs 100 Watt: lamp #100 .' W Mercury Vapor, H 38 -45 A /DX, Pole shall . , be American Concrete, Pale 1101-E-12, complete including all labor and materials at $1, 0.00. 00 ''.. 1 each . . •'. . ' ..'. ' .' $ 3,000.00. 3, 8. adjust existing;, manholes. to the proposed : : . grade of the pavement or parkway, including top masonry adjustment or. reconstruction complete at $75.00 each i i $ 600.00 a 4. 4 '... each adjust existing; Vlave Vaults to the proposed • :; grade of the pavement or parkway, including :. .top masonry adjustment or reconstruction; : complete at $75. 00 each'. $. 300.00 4 ." each adjust existing fire hydrants to finished : : .. `. •' grade, including dismantling, salvaging; suitable- materials, furnis-hiiTg- wnd— ii-stallin"g ., ...all appurtenances and pipe, and disposal of'-.: . �• , surplus materials, l complete in,-place at 1 $150 .'00 each . , ', ..... .- . •. � .�• '. $ 600.00 1 V t