Loading...
O-68-49F- 14 ORDINANCE NO. 0 -68- 49 AN ORDINANCE TO AMEND ORDINANCE NO. 0 -67 -56 ENTITLED: "AN ORDINANCE PROVIDING FOR THE GRADING, PAVING, DRAINING, AND OTHERWISE IMPROVING THE ROADWAY OF HERTEL LANE AS EXTENDED FROM WILMOT ROAD TO CAROL LANE, INCLUDING SIDEWALKS, WATER MAINS, SANITARY AND STORM SEWERS,..IN THE VILLAGE.OF DEERFIELD, LAKE AND COOK COUNTIES, ILLINOIS" BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF DEERFIELD, LAKE AND COOK COUNTIES, ILLINOIS, AS FOLLOWS: ,SECTION Ordinance No. 0- 67 -56, entitled "AN ORDINANCE ONE: PROVIDING FOR THE GRADING, PAVING,.DRAINING, ,AND OTHERWISE IMPROVING THE ROADWAY OF HERTEL LANE AS EXTENDED FROM WILMOT ROAD TO CAROL LANE, INCLUDING SIDEWALKS, WATER MAINS, SANITARY AND STORM SEWERS, IN THE VILLAGE OF DEERFIELD, LAKE AND COOK COUNTIES, ILLINOIS", hereto- fore adopted by the President and Board of Trustees of the Village of Deerfield on .the 18th day of September, 1967, is amended by amending SECTION TWO thereof to read as follows: "SECTION The recommendation of the Board of TWO: Local Improvements providing for the improvement and the supplemental cost thereof, made by the President of the Board of Local Improvements, both hereto attached and made a part hereof, be and the same are hereby approved." SECTION All other provisions of Ordinance No. 0 -67 -56 TWO: shall remain in full force and effect. SECTION This Ordinance shall be in full force and effect THREE: from and after its passage and approval thereof. AYES: SIX (6 NAYS: NONE (0) ABSENT: NONE (0) PASSED this _ 16W; ..__ day of . SeRte ber A.D'. 1968 APPROVED this 16th day of September A ".D'. 1968 ATTEST: r Village Preside r RECOMMENDATION BY THE BOARD OF LOCAL IMPROVEMENTS OF THE VILLAGE OF DEERFIELD, LAKE COUNTY, ILLINOIS, TO THE BOARD OF TRUSTEES OF THE SAID VILLAGE OF DEERFIELD, FOR THE PASSAGE OF AN ORDINANCE AMENDING AN ORDINANCE,PROVIDING'FOR A LOCAL IMPROVE- MENT TO: President and Board of Trustees Village of Deerfield i Lake County, Illinois We herewith submit an Ordinance Amending an Ordinance providing for the making of a Local Improvement entitled as follows: "AN ORDINANCE PROVIDING FOR THE GRADING, PAVING, DRAINING AND OTHERWISE IMPROVING THE ROADWAY OF HERTEL LANE AS EXTENDED FROM WILMOT "GOAD TO CAROL LANE, INCLUDING SIDEWALKS, WATER MAINS, SANITARY AND STORM SEWERS, IN THE VILLAGE OF DEERFIELD, LAKE AND COOK COUNTIES.; ILLINOIS" together with a Supplemental Estimate of the cost of said Improvement and recommend the passage of said Ordinance and the making of the Improvement contemplated thr.rein. Respectfully-submitted, BOARD OF LOCAL IMPROVEMENTS, DEERFIELD, ILLINOIS President Member Member Member ember ATTEST: Member 2 March 31, 1967 ..; rile 1,11226 Revised W1 ay. 3, 1967 SUPPLEMENTAL PRESIDENT.' -S :- COST ESTIMATE FOR •HE�tTE.L I.ANE: S.A. 106, DEERFIELD, ILLINOIS Item No.. Quantity Item Amount -A. GRADING & PAVING C, Y. of Excavation for the Non - Reinforced P. C, C. Pavement 'with an integral curb, driveway replacement. The parkways, including the removal &disposal of all earth .-all sub - grading & compacting, furnishing & placing of all borrow that may be required, .".—Placing of al.l fill, removal of.al.l existing ' pavement including base &• Surface Courses, curbs, &' gutters, combined curb & gutters„ • 'driveways, & the removal & disposal of all l.og, skimps, brush; 'trees under six' (6 ") .,inch diameter, 'vcgrtation, rubbish &other: objectionable matters complete in place at $1.75 per C. Y. .$2.,292.50 .2, 1,.326". S'. Y. Non - reinforced 'P. C. C. Pavement 6 "_,,thick with integral curb, including ,' .longitudinal, transverse and expansion joints, complete at $5:.25 per S. Y. 6,930.00 .3. " 5, 400 .' S, F. P, C. C. Sidewalk'4" thick and all znatorials, placing, finishing, backfilling and expansion joints, .complete in place i at $0. 65 per S. F. 3,510.00 4, 630: S. P. P.C. C. Driveway 1) avcrnent, 6" thick, and all materials, Placing, finishing , backfilling and expansion joints, complete in place at $0. 80 per S. F. 544.00 5.. 230. S. Y. crushed stone surface course Type D Grade 8, 6" compacted thickness, for drive- . ways, including placing, spreading compacting and leveling complete in place at $2. 15 per S.F. $ 494..50 Sub Total for Grading and'Paving: $13.,771...00 2 Amount $1,787.50 54.00 121.50 150.00 300.00 $2,713.00 Item No. Quantity Item B. STORM DRAINAGE 1. 325 L. F. '12" Storm Sew,,r ASTM Designation C -76, Class III Complete in Place at $5. 50 per L. F. 2. 9' L. F. 12" Storm Sewer ASTM Designation C -76, Clas.s III Inlet Connection Complete ' 'in Place at - $6. 00 per L. F. 3. 27 .L. F. 10" Storm Sewer ASTM Designation C -76 Clas.s III Inlet Connections complete in Place at $4, 50 per L,,F, 4, 1 Each, Concrete Inlet; 24" I, D. , 5" Wall thickness on 4" concrete foundation, incl- uding all labor and materials, excavation and removal of surplus material and standard-frame and grate complete in place at $150.00 Each 5. 1 Each Concrete Inlet Catch Basin, 48" I. D. 5" Wall Thickness, on 6" concrete founda- tion, with sunip as shown on plans, including all labor and materials, excavation and removal of surplus material. and standard frame and grate complete in place at $300.00 Each 6. 1 Each Concrete Manhole 48" I, D., =. Wall Thickness, on 6" concrete founda:i:, :: with moulded inverts, including all labor: and materials, excavation and removal of surplus material and standard frarn—, and cover complete in place at $300.00 :ach Sub Total for Drainage Construction: ' fil -3- Amount $1,787.50 54.00 121.50 150.00 300.00 $2,713.00 0 - 4 Item No. Quantity Item Amount'. C. SANITARY SEWERS: 1. 315 • L. F. of V. C..P. 8" diameter, ASTM Designation, C -200, with C -425 Type III joints, including excavation, laying, hackfilling and disposal of surplus excava- ted material, complete in place at $5.00 per L.F. $.19575.00 2. 2 Each Precast Concrete Manholes, 48" I. D., 5" Wall thickness, on 6" concrete -foundation with moulded inverts, including all labor and materials, excavation and' removal of surplus material and standard frame and cover, complete in place at $350.00 Each 700.00 3. 5 Each 6" V. C. 1'. ASTM Designation C -200 with Type III .joints, House service, laid complete to property line including excava- tion, laying, backfilling, removal of surplus materials at $150.00 Each 750:.00 Sub Total for Sanitary Sewers: $3,025:00 0 - 4 TOTAL ESTIMATED COST OF- IMPROVEMENT: $29,646..61, President Board of-Local Improvements Item No. Quantity Item Amount D. ' WATER SUPPLY 1. 657 L, F. of 6" I. D. Bell and Spigot, CIWM laid- complete with ring tight couplings or equal in all excavation, connection to existing or proposed mains, select backfill, .removal of all surplus excavated material, sterilization of main and pressure testing at $4.50 per. L. F. $3,037.50 .1 Each, Fire Hydrant complete with , auxiliary valve and all necessary labor and material to install at $425. 00 Each 425-00 3, 1 Each, 6" Pressure Tap, including construction of valve and vault to he made at casting 10 ". main, taking all necessary precautions, constructed complete at $600. 00 Each 600.00 4. 5 Each 3/4" Copper water pipe, Type K, house services with tap, corporation cock, round way and buffalo box, laid complete to property line including excavation, laying, backfilling, and removal of surplus material at $150. 00 Each 750.00 Sub Total Waterma'in: $4',812.50 .Total Estimated Cost of Construction $24,321.50 Cost of Engineering, Inspection and 'Quality Control $' 3,647.00 TOTAL:-. , $27,968,50 All lawful expenses attending the proceedings for making said improvements, including the court costs and the making, levying and collection-of the assessment of said improvement, not in excess of six (6) percent of the cost of said improvement. $1', 678.1-L TOTAL ESTIMATED COST OF- IMPROVEMENT: $29,646..61, President Board of-Local Improvements