Loading...
O-67-48IV. ORDINANCE NO. 0- 67 -46 AN ORDINANCE PROVIDING FOR THE IMPROVEMENT OF POR- TIONS OF GORDON TERRACE, LAUREL AVENUE, ROSEWOOD AVENUE, WILMOT ROAD, KENMORE AVENUE, WILLOW AVENUE, BIRCHWOOD AVENUE, FAIRVIEW AVENUE, AND COUNTY LINE ROAD BY DRAINING, INCLUDING SANITARY SEWERS AND WATER MAINS AND SANITARY SERVICES AND WATER SERVICES TO LOTS WITH EXISTING RESIDENCES/ BE IT ORDAINED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF DEERFIELD, LAKE AND COOK COUNTIES, ILLINOIS, AS FOLLOWS: SECTION That a local improvement shall be made in the ONE: Village of Deerfield, Lake and'Cook Counties, Illinois, the nature, character, locality and description of which improvement is as follows: In Gordon Terrace from the existing pavement at the East right -of -way line of Wilmot Road to the existing pavement at the West right -of -way line,of Willow Avenue by draining, sanitary sewers, water mains, sanitary services and water services to lots with existing residences; in Laurel Avenue from the existing pave- ment at the East right -of -way line of Wilmot Road to the existing pavement at the West right -of -way line of Willow Avenue by draining, sanitary and storm sewers and sanitary services to lots with existing residences; in Rosewood Avenue from the existing pavement at the East right -of -way line of Wilmot Road to the existing pavement located 180 feet West of the center line of Willow Avenue by draining, water mains and water services to lots with existing residences; in Wilmot Road from the existing water main located in County Line Road to the existing water main located 500 feet South of the center line of Iiackberry Road by the construction of a water main, sanitary sewer, sanitary services and water services to lots with existing residences; in Kenmore Avenue from the existing pavement located 9 feet North of the center line of County Line Road to the South right -of -way line of Rosewood Avenue by draining, including sanitary sewers, water mains, sanitary services and water services to lots with existing residences; in Willow Avenue from the North right -of -way line of County Line Road to the South right - of -way line of Country Lane by the construction of water I . 2 . mains; in Birchwood Avenue from the existing pavement located 9 feet North of the center line of County Line Road to the existing storm sewer located 20 feet North of the center line of Hackberry Road by draining, including sanitary sewers, water mains, sanitary services and water services to lots with existing residences; in Fairview Avenue from the existing pavement located 9 feet North of the center line of County Line Road to the existing storm sewer located 20 feet North of the center line of Hackberry Road by draining, including sanitary sewers, water mains, and sanitary services and water servicestbo lots with existing residences; in County Line Road from the proposed storm sewer in Fairview Avenue to the existing culverts located 111 feet West of the West right -of -way line of Fairview Avenue by the construction of a storm sewer. -'' November 15, 1963 Revised June 1, 1967 Revised June 23, 1967 ESTIMATE TO THE BOARD OF LOCAL IMPROVEMENTS OF THE VILLAGE OF DEERFIELD, LAKE COUNTY, ILLENOIS RE, HOVELAND SUBDIVISIONT SPECIAL ASSESSMENT NO, 107 Gentlemen: I herewith subunit an estimate of cost of an improvement in Gordon Terrace from the existing pavement at the. East right -of -way line of Wilmot Road to the existing paves ent at the West right -of -way line of Willow Avenue by draining, sanitary sewers, water mains, sanitary services and water services to lots with existing residences; in Laurel Avenue from the existing pavement at the East right -of -way line of Wiln;ot Road to the existing pavement at the West right -of -way line of Willow Avenue by draining, sanitary and storm sewers and sanitary services to lots with existing residences; in Rosewood Avenue fr.oni the existing pavement at the .East right -of -way line oi' W ilrnot Road to the existing pavement located 180 feet West of the center line of Willow Avenue by draining, water mains and water services to lots with existing residences; in Wilmot Road from the existing water main located in County Line Road to the existing water main located 500 .feet South of the center line of Hackberry Road by the construction of a water main, sanitary sewer, sanitary services and water services to lots with existing residences; in Kciu-nore Avenue from the existing pavement located 9 feet North of the center line of County Line Road to the South right -of -way line of Rosewood Avenue by draining, including sanitary sewers, water - mains, sanitary services and water services to lots %vith existing residences; 'in Willow Avenue from the North right - of -way line of County Line Road to the South right -of -way line of Country Lane by the construction of water mains; in Birchwood Avenue from the existing paverrient located 9 feet North, of the center line of County Line Road to the existing storm sewer located 20 feet North of the center line of Hackberry Road by draining, including sanitary sewers, water mains, sanitary services and water services to lots with existing residences; in Fairview Avenue from the existing pavement located 9 feet North -of the center line of County Line Road to the existing storm sewer located 20 feet North of the center line of Hackberry Road by draining, including sanitary sewers, water rr,ains, and sanitary services and water services to lots with existing residences; in County Line Road from the proposed storm sewer in Fairviev,, Avenue to the existing culverts located I l feet West of the West right -of -way line of Fairview Avenue by the construction of a storm sewer; all in accordance with the plans and specifications for Hoveland Subdivision Special Assessment No. 107 and including engineering services and all labor, .materials and other expenses necessary to construct the herein proposed improvements all in the Village of Deerfield, County of Lake, and State of Illinois. • �. Page 2 The estimated cost of the herein proposed improvement, including labor and materials and all lawful expenses attending the same, is the sum of Three Hundred Fifty Six Thousand, Eight Hundred Ninty Nine Dollars and Eighty Eight C;,.nts ($356, 899.88) itemized as follows: . The following nine items shall be constructed of reinforced concrete sewer pipe designated on the plans as RCP (A.S. T.M. C -76) Class as noted. The sizes of pipe as given herein refer to the internal diameter. The unit price per lineal foot for each size of storm sewer shall include all excavating, laying, backfilling and disposal of surplus excavated material complete in place as specified. 1. 1, 325 lineal feet of 54 inch storm sewer Class III complete in place at $33. 00 per lineal foot $ 43,7Z5.00 2. 648 lineal feet of 54 inch storm sewer Class II • complete in place at $32. 00 per lineal foot 20, 736. 00 3. 662 lineal feet of 48" storm sewer Class III complete in place at $28. 00 per lineal foot 18, 53 5.00 4. 781 lineal feet of 48 inch storm sewer Class II complete in place at $27. 00 per lineal foot 21, 087. 00 5. 586 lineal feet of 42 inch storm sewer Class II complete in place at $24. 00 per lineal foot 14, 064. 00 6. 265 lineal feet of 21 inch storm sewer Class III complete in place at $8. 50 per lineal foot 2,252.50 7. 500 lineal feet of 18 inch storm sewer Class III complete in place at $7..50 per lineal foot 3,750.00 8. 50 lineal feet of 15 inch storm sewer Class III complete in place at $6. 50 per lineal foot 325.00 9. 585 lineal feet of 12 inch storm sewer Class III complete in place at $5. 50 per lineal foot 3,217. 50 10. 40 lineal feet of 21 inch internal diameter corrugated metal pipe 16 guage laid complete with metal bands, including all trenching, backfilling, flushing and removal of surplus excavated materials at $7.00 per lineal foot 280.00 Page 3 11. 50 lineal feet of 18 inch internal diameter corrugated metal pipe 16 guage laid complete with metal bands, including all trenching, backfilling, flushing and removal of surplus excavated material at $6. 75 per lineal foot 337. 50 12. 500 lineal feet of 15 inch internal diameter corrugated metal pipe 16 guage laid complete with metal bands, including all trenching, backfilling, flushing and removal of surplus excavated material at $6. 00 per lineal foot 3,000.00 13. 1,550 lineal feet of 12 inch internal diameter corrugated metal -pipe -16 guage laid complete with metal bands, including all trenching, backfilling, flushing and removal of surplus excavated material at $5. 25 per lineal foot , 137. S4 14. 2 each, concrete manholes 48 inch I. D. , 5 inch wall thickness, on 6 inch concrete foundation with moulded inverts, including all labor and materials, excavation and removal of surplus material and standard frame and cover complete in place at $300. 00 each . . . . . . . . . . . . . 600.00 15. 2 each, concrete manhole s 60 inch I. D. , 5 inch wall thickness, on 6 inch .concrete foundation with moulded inverts, including all labor and materials, excavation and removal of surplus material and standard frame and cover complete in place at $325. 00 each . . . . . . . . . . . . 650.00 The following three items all being special poured concrete manholes, including all labor and materials, excavation, forming, curing, cleaning, backfilling, removal of surplus material and standard frame and cover are as follows: 16. 1 each, of Special Manhole, Type G, complete in place as shown on the plans, at $1500. 00 each 17. 6 each, of Special. Manhole, Type F, complete in place as shown on the plans, at $1000. 00 each 18. 5 each, of Special Manhole, Type E, complete in place as shown on the plans, at $500. 00 each $ 1,500.00 2,500.00 Page 19. each, concrete box inlets, including all labor and material, excavating, forming, curing, cleahing;. backfilling, removal of surplus tna.terial, complete in place as showm on the plans at $250. 00 each . . . . . . . . . . . $ 1,500.00 20. 1 each, special concrete headwall for 18 inch concrete sewer pipe, including all labor and. material; excavating, forming, curing, cleaning backfilling and removal of surplus material, complete in place ae shown on the plans at $200.00 each . . . . . . . . . . 200.00 21. 19 each, corrugated metal end - sections, 12 inch including all labor and material; complete in place as shown on plans at $25.00 each . 475.00 22. 15 each, corrugated metal end - sections, 15 inch including all labor and material, complete in place as shown on plans at $30.00 each . 450.00 23. 3 each, corrugated metal end - sections, 18 inch including all labor and material, complete in place as shown on plans at $35. 00 each . . . . 105.00 24. 1 each, corrugated metal end - section, 21 inch including all labor and material, complete in place as .shown on plans at $45. 50 each . 45.50 25. 3, 194 lineal feet of. 10 inch internal diameter (C -200) vitrified tile sewer pipe laid complete -with .0 -425 joints including wye branches, all excavating, laying, backfilling and removing surplus excavated materials, at $5. 25 per lineal foot . . . . . . . . . . . . . . . . . .. 16, 768. 50 26. 5, 093 lineal feet of 8 inch internal diameter (C -200) vitrified tile sewer pipe laid complete with C -425 joints including wye branches, all excavating, laying, backfilling and removing surplus excavated materials; at $4. 50 per lineal foot . . . . . . . . . . . . . . . . 22, 9 1-8. to 27. ", 840 lineal feet of 6 inch internal diameter (C -200) , vitrified tile sewer pipe laid complete with C -425 joints including excavating, laying, backfilling, removing suplus excavated materials, at $3. 25 per lineal foot Page 5 28. 130 lineal feet of 6 inch internal diameter (C -200) vitrified tile riser pipe with C -425 joints laid complete including all excavation, laying and backfilling at $7. 00 per lineal foot . . . . . . $ 910.00 29, 31 each, precast concrete -manhole 48 inch 1. D. 5 inch wall thickness on 6 inch concrete foundation with moulded' inverts, including all labor, and materials, excavation and removal of surplus materials, and standard frame and cover complete in place at $300. 00 each . . . . . . . . . . .. 9,300.00 30. 2„ 104 lineal feet of 10 inch internal diameter cast iron water main Class 22 bell -tite joint or equal (Alternate: Asbestos cement pipe with "Ring Tite" coupling or equal), laid complete at a minimum depth of 6 feet, including all connections. excavating, backfilling, flushing, testing, sterilizing and removal of surplus excavated material at $6. 50 per lineal foot . . . . . 13, 676.00 31. lineal feet of 8 inch internal diameter cast iron water main Class 22 bell -tite joint or equal (Alternate: Asbestos cement pipe with "Ring Tite" coupling or equal), laid complete at a minimum depth of 6 feet, including all connections excavating, backfilling, flushing, testing, sterilizing and removal of surplus excavated material at $5. 50 per lineal foot . . . . . . . . 9, 922.00 32. 74 647 lineal feet of 6 inch internal diameter cast iron water main Class 22- bell -tite joint or equal (Alternate: Asbestos cement pipe with "Ring Tite" coupling or equal), laid complete at a minimum depth of 6 feet, including all connections excavating, backfilling, flushing, testing, sterilizing, and removal of surplus excavated material at $4, 50 per lineal foot . . . . . . . . 34.4I1.50 33. 45 each, 3/4 inch taps or connections to the water main .including corporation stop, curb stop and service box, installed complete including all excavation, backfilling, and removal of excava- ted material at $37. 50 each . . . . . . . . . . . 1,687.50 40. 130 lineal feet of tunneling or auguring sanitary sewer or water main under existing trees or roads, at $30. 00 per lineal foot . . . . . . . . . . . . . 3, 900.00 41. 8,000 cubic yards of grading for parkways and ditches including stripping, replacing of top soil and seeding, at $1. 00 per cubic yard. . . . . . . . 8,000.00 f ' Page 6 34. 1, D80 lineal feet of 3/4 inch internal diameter copper water pipe, type "K ", laid complete including excavating,laying, backfilling and removal of surplus excavated material at $3. 00 per lineal foot . . . . . . . ... . . . . . . . . . . . . . $ 3.240.00 35. Z each, 10 inch valve in vault, including all labor and materials, excavating, backfilling, removal of surplus material, complete in place as shown on the plans at $400. 00 each . . . . . . . . . . . t $00. 00 36. 2 each, 8 inch valve in vault including all labor and materials, excavating, backfilling, removal of surplus material, complete in place as shown .on the plans at $350.00 each . . . . . . . . . . 700.00 37. 7 each, 6 inch valve in vault, including all labor. and materials, excavating, backfilling, removal of surplus material, complete in place as shown on the plans at $300. 00 each . . . . . . . . . . 2,100.00 38. 19 each, fire hydrants, (AWWA Compression type - Deerfield standard) with auxiliary valve. Hydrant is to have two 2 1/2 inch hose connections and steamer connection and a 5 inch valve opening installed complete at $350. 00 each . . . . . . . 6,650.50 39. 2 each six inch connections to existing main, including construction of valve and vault, to be made -on existing 6 inch main, talcing all necessary precautions, constructed complete at $700. 00 each 1,400.00 40. 130 lineal feet of tunneling or auguring sanitary sewer or water main under existing trees or roads, at $30. 00 per lineal foot . . . . . . . . . . . . . 3, 900.00 41. 8,000 cubic yards of grading for parkways and ditches including stripping, replacing of top soil and seeding, at $1. 00 per cubic yard. . . . . . . . 8,000.00 Page 7 Total Estimated Cost of Construdtion $292,587.50 Cost of Engineering and Inspection 44, 110. 50 TOTAL: $336,698.00 All lawful expenses attending the proceedings for making said improvements, including the Court costs and the making, levying and collection of the assessment of said improvement, not in excess of six (6) percent of the Cost of said Improvement $ 20, 201.88 Total Estimated Cost of Improvement . . . . . . . . . . . . . . 356, 899.88 I do hereby certify that in my opinion the said estimate does not exceed the probable cost of the improvement and the lawful expenses attending the same. Dated at Deerfield, Illinois, June ], 1967 CHARLES W. GREENGARD ASSOCIATES, INC. Charles W. Greengard Registered Professional Engineer in Illinois - #16298 SECTION The recommendation of the Board of Local TWO: Improvements providing for the improvement and the estimated cost thereof, made by the President of the Board of Local Improvements both hereto attached and made a part thereof, be and the same are hereby approved. SECTION That said improvement shall be made and the THREE: whole cost thereof, together with an amount not exceeding six per cent (6 %) of the estimated cost, to -wit: TWENTY THOUSAND TWO HUNDRED ONE and 88 /100ths ($20,201.88) DOLLARS, which is hereby provided for to apply towards the cost and expense of making, levying and collecting the special assessment and all other expenses allowed by law, being the amount included in the estimate therefor shall be paid by special assessment levied in accordance with Article 9, Division 2, Chapter 24, of the Illinois Revised Statutes, as amended, being an Act entitled "Illinois Municipal Code ", approved May 29, 1961, together with all Amendatory and Supplemental Acts (excepting Article 9, Division 3). SECTION Thatithe aggregate amount herein ordered to be FOUR: assessed to pay the cost of said improvement against the property and also the assessment on each lot and parcel of land herein assessed shall be divided into ten (10) installments in the manner provided by the statute in such case made and provided and each of said installments shall bear interest at the rate of six per cent (6 %) per annum, according to law until paid. SECTION For the purpose of anticipating the collection of FIVE: the second and succeeding installments of said assessment for the cost of said improvement, the Village shall issue bonds payable out of said installments, bearing interest at the rate of six per cent (6 %) per annum, payable annually, signed by the President and attested by the Clerk of said Village under the corporate seal. Said bonds shall be issued in accordance with, and shall in all respects conform to the provisions of Article 9, Division 2, Chapter 24, of the Illinois Revised Statutes, as amended, being an Act entitled "Illinois Municipal Code ", approved May 29, 1961, together with all Amendatory and Supplemental Acts (excepting Article 9, Division 3). SECTION That the President be and he is hereby directed SIX: to file a Petition in the Circuit Court of Lake County in the name of the Village praying that steps may be taken to levy a special assessment for said improve- ment, in accordance with the provisions of this Ordinance and in the manner prescribed by law. SECTION All ordinances, or parts of ordinances in SEVEN: conflict herewith, be and the same are hereby repealed. SECTION That this Ordinance shall be in full force and EIGHT: effect from and after its passage and the approval thereof according to law. AYES: FOUR (4) NAYS: NONE (0) ABSENT: TWO: ( 2 . PASSED THIS 21st day of August , A.D. 1967. APPROVED THIS 21st day of August , A.D. 1967. ATTEST: Village C erk r r Villaqe President 0 w i SECTION All ordinances, or parts of ordinances in SEVEN: conflict herewith, be and the same are hereby repealed. SECTION That this Ordinance shall be in full force and EIGHT: effect from and after its passage and the approval thereof according to law. AYES: FOUR (4) NAYS: NONE (0) ABSENT: TWO: ( 2 . PASSED THIS 21st day of August , A.D. 1967. APPROVED THIS 21st day of August , A.D. 1967. ATTEST: Village C erk r r Villaqe President 0 INSTRUCTIONS TO DELIVERING EMPLOYEE ®Show to whom and f�RliW to whom, when, and ❑ Deliver ONLY when delivered L_ } 1ress where delivered to addressee (Additional charges required for these services) RECEIPT Received the nu t'cJe desct " !edr'below. ' REGISTERED NO. SI R ( din) r CERTIFIED NO. �!311650 SIGNATURE OF RESSEE'S AGENT, IF ANY INSURED N0. c) Ow DATE DELIVERED ^ SHOW WHER OCLl%FR requested) ♦9 q o55 10 7154B 7 GPO 74 00 M POST OFFICE DEPARTMENT PENALTY FOR PRrQ1ZUSETQ AVOID OFFICIAL BUSINESS PAYMeAT OF P05TAGE. 9M iJIAI OP �. RINQ OFFICIVI. F p INSTRUCTIONS Show name and address below and complete instructions on other side, where applicable. RETURN Moisten gummed ends, attach and hold firmly to back of article. Print on front of article RETURN TO _g-gCEIPT REQUESTED. NAME OF SENDER Village Clerk STREET AND NO. OR P.O. BOX _ Village Hall, 850 Waukegan Road CITY, STATE, AND ZIP CODE Deerfield, Illinois 60015