Loading...
O-62-44• • \U VV /� ORDINANCE NO. 62 - � q Be it ordained by the President and Board of Trustees of the Village of Deerfield that: Section seven of article eleven of the Building Code of the village be and the same is hereby amended to read as follows: 117`Applications: Applications for building permit0shall be made in duplicate to the Building Commissioner and shall be accompanied by plans, elevations, critical sections and details drawn to scale and specifiacti_ons so as to clearly show the metliod of F-ae- oTq s n TN,a-n! SJAS Lf,_ PAW, L-y 12ES r Des construction and materials to be used:. eh plansVshall be .,�-if-i-ed c e r t i f i e d A-Nn aw6l jaAff4L.- by the architect qag� acting for such owner. Additional necessary information shall be submitted at the request of-the Building Commissioner. This certificate shall be in the following f orm : Architect's Certification. "I do hereby certify that these drawings have been prepared under my direct supervision and to the best of my knowledge conform to all codes and ordinances of the Village of Deerfield, Illinois." (Signed) License Number No such certificate shall be required for remodelling done by the owner not affecting bearing walls or supports nor for exterior steps, walls, patios or exterior buildings. During construction the architect or engineer in charge shall, at the times indicated, submit a certificate substantially as follows: - 1 - The ordinance pertaining to inspection o7" supervision to be amended to include the following certification to be signed and sealed by the architect �er engineer who has certified the drawings for any construction project: "Inspection Certification: Project Name Address Permit Number "I do hereby certify that I myself, or an authorized representative of my firm has inspected the subject project at the following-stages and find the construction in strict accordance with approved permit drawings and specifications, and any deviations therefrom as approved by the Village of Deerfield on file with the Building Commissioner: Stage of Construction: 1. Sub grade utilities 2. Foundations (piles, caissons, footings, etc.) 3. Concrete formwork & reinforcing 4. Superstructure a) General trades b) Structure c) Electrical work Heating 6 Ventilating Work Plumbing work 5. Final inspection Date(s) of Inspection Respectfully submitted, (authorized signature PASSED THIS DAY OF 1962 APPROVED: ATTEST: � —6 � A CLERK