Loading...
R-13-05K — 1'3'�c REQUEST FOR BOARD ACTION Agenda Item: 13 -43 Subject: Resolution for 2013 MFT Street Rehabilitation Project Action Requested: Adoption of Resolution ($694,000) Originated By: Department of Public Works and Engineering Referred To: Mayor and Board of Trustees Summary of Background and Reason for Request: This resolution appropriates and authorizes maintenance expenditures for the 2013 Street Rehabilitation Project. The project this year will include rehabilitation of seven streets and various location patching throughout the Village. Streets to be rehabilitated are as follows: Street Name Cherry Street Bayberry Lane Timberhill Road Carriage Way Springfield Avenue Bent Creek Ridge Hackberry Road Start Southern end of street Appletree Lane Charing Cross Road Bent Creek Ridge Southern end of street Carriage Way Public Works Entrance End Greenwood Avenue Pine Street Bayberry Lane Deerfield Road Fair Oaks Avenue Carriage Way Locust Place The scope of work includes pavement grinding and resurfacing, pavement patching, curb and gutter removal and replacement, sidewalk removal and replacement, adjustment of structures and parkway restoration. The Director of Public Works and Engineering is requesting the Village Manager to sign the MFT Resolution for the 2013 Street Rehabilitation Project. Reports and Documents Attached: Resolution in the amount of $694,000 Date Referred to Board: April 15, 2013 Action Taken Illinois Department of Transportation Resolution for Improvement by Municipality Under the Illinois Highway Code BE IT RESOLVED, by the President and Board of Trustees of the Council or President and Board of Trustees Village of Deerfield Illinois City, Town or Village that the following described street(s) be improved under the Illinois Highway Code: Name of Thoroughfare Route From To Cherry Street Southern end of street Greenwood Avenue Bayberry Lane Appletree Pine Street Timberhill Road Charing Cross Road Bayberry Lane Carriage Way Bent Creek Ridge Deerfield Road Springfield Avenue Southern end of street Fair Oaks Avenue Bent Creek Ridge -Hackberry Road Carriage Way Public Works Entrance Carriage Way Locust Place BE IT FURTHER RESOLVED, 1. That the proposed improvement shall consist of Pavement patching, curb and gutter removal and replacement, sidewalk removal and replacement, bituminous resurfacing, R/R and adjustment of structures, and parkway restoration. and shall be constructed V/1 2 10 (/ (�, wide and be designated as Section 1'3 —tYj U q � —0c)— PV 2. That there is hereby appropriated the (additional 0 Yes 0 No) sum of Six Hundred and Ninety Four Thousand and 00/100 Dollars ( $694,000.00 ) for the improvement of said section from the municipality's allotment of Motor Fuel Tax funds. 3. That work shall be done by Contract ; and, Specify Contract or Day Labor BE IT FURTHER RESOLVED, that the Clerk is hereby directed to transmit two certified copies of this resolution to the district office of the Department of Transportation. Approved Date Departm t of Transportation �;•' Regional Engineer I, Kent S. Street Village of Deerfield City. Town or Village County of Lake and Cook Clerk in and for the , hereby certify the foregoing to be a true, perfect and complete copy of a resolution adopted by the President and Board of Trustees Council or President and Board of Trustees at a meeting on April 15, 2013 Date IN TESTIMONY WHEREOF, I have hereunto set my hand and seal this ." "11 1 5th ' r� �a�€ s, April 2013 .•ISEAL) '•�' %cIty, 1,01wri, or V114eClellk r .