R-22-50VILLAGE OF DEERFIELD RESOLUTION NO. 2022- R-22-50 A RESOLUTION APPROVING AN AGREEMENT WITH CIORBA GROUP, INC OF CHICAGO, ILLINOIS FOR EMERGENCY WATER CONNECTION PRELIMINARY ENGINEERING SERVICES WHEREAS, the Village of Deerfield ("Village's is a home rule municipality in accordance with Article VII, Section 6 of the Constitution of the State of Illinois of 1970; and WHEREAS, the Village desires to retain a firm to provide engineering services for Emergency Water Connection Preliminary Engineering Services ("Services'); and WHEREAS, the Village received a proposal from Ciorba Group, Inc. of Chicago, Illinois ("Consultant') to provide the Services; and WHEREAS, the Village and Consultant desire to enter into an agreement for the provision of the Services by Consultant ("Agreement'); and WHEREAS, the Mayor and Board of Trustees have determined that entering into the Agreement with Consultant will serve and be in the best interest of the Village and its residents; NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE BOARD OF DEERFIELD, LAKE AND COOK COUNTIES, ILLINOIS, as follows: SECTION 1: RECITALS. The Village Board hereby adopts the foregoing recitals as its findings, as if fully set forth herein. SECTION 2: APPROVAL OF AGREEMENT. Pursuant to the Village's home rule authority, the Agreement by and between the Village and Consultant is hereby approved in substantially the form attached to this Resolution as Exhibit A, and in a final form and substance acceptable to the Village Manager and the Village Attorney. SECTION 3: AUTHORIZATION TO EXECUTE AGREEMENT. The Mayor and the Village Clerk are hereby authorized and directed to execute and attest, on behalf of the Village, the final Agreement upon receipt by the Village Clerk of at least one original copy of the final Agreement executed by Consultant; provided, however, that if the executed copy of the final Agreement is not received by the Village Clerk within 60 days after the effective date of this Resolution, then this authority to execute and attest will, at the option of the Mayor and Board of Trustees, be null and void. SECTION 4: EFFECTIVE DATE. This Resolution shall be in full force and effect from and after its passage and approval according to law. [SIGNATURE PAGE FOLLOWS] {00124077.11 AYES: Benton, Berg, Jacoby, Oppenheim, Seiden NAYS: None ABSTAIN: None ABSENT: Metts-Childers PASSED: September 19, 2022 APPROVED: September 19, 2022 RESOLUTION NO: R-22-50 Daniel C. Shapiro, Mayor ATTEST: Kent . Street, V' age Clerk {00124077.11 EXHIBIT A Agreement {00124077.11 Agreement for Engineering Services Village of Deerfield Water Interconnect Transmission Main Preliminary Engineering Services This AGREEMENT, made effective this 5' u . day of r , 20_ by and between the Village of Deerfield (hereinafter referred to as the "VILLAGE"), and Ciorba Group, Inc. located at 8725 W. Higgins Road, Suite 600 in Chicago, Illinois, a firm of Consultants (hereinafter referred to as "CIORBA"), with regard to providing preliminary engineering and other services in connection with the _Water Interconnect Transmission Main_ (hereinafter referred to as the "PROJECT"). The PROJECT involves the routing study and topographic survey of approximately two o_ miles of 16" water transmission main. NOW THEREFORE, the VILLAGE and CIORBA, in consideration of the mutual covenants hereinafter set forth, agree to as follows: Basic Agreements of Ciorba CIORBA, in signing this AGREEMENT, certifies that it is in compliance with the Illinois Statutes relating to professional registration of individuals and to corporate practice for rendering such services. CIORBA further certifies that 362525351 is its correct Federal Taxpayer Identification Number and that it is doing business as a corporation. 2. CIORBA does hereby certify that it is not barred from entering into this contract as a result of a violation of either Sec. 720 ILCS 5/33E-3 or 720 ILCS 5/33E-4 of Chapter 38, Illinois Revised Statutes. CIORBA warrants that it has complied with applicable Federal, State and local laws pertaining to labor, equal employment opportunity and contract procurement and knows of no violations thereof, and such warranty shall survive until time of completion of the project. 4. CIORBA agrees to perform certain enumerated services in connection with the PROJECT hereinafter stated as described in EXHIBIT A —SCOPE OF SERVICES. CIORBA will serve as the VILLAGE'S representative in those phases of the Project to which this Agreement applies and will give consultation and advice to the VILLAGE during the performance of its services. 5. The work shall commence within five (5) days of receiving written authorization to proceed from the VILLAGE. Services shall be completed by December 31, 2022. Time to complete the services excludes from consideration periods of delay caused by circumstances beyond the control of CIORBA and, if applicable, review time by any necessary State and Federal agencies. Page 1 of 6 <<7 CiorbaG ro u p Revised 04/ 26 /.2021 6. CIORBA agrees to maintain insurance coverage in the following minimum amounts: Professional Liability $2,000,000 per claim/aggregate General Liability $1,000,000 Each Occurrence - Bodily Injury $1,000,000 Each Occurrence - Property Damage $2,000,000 Aggregate Automotive Liability - including non -ownership and hired car coverage Employer's Liability Worker's Compensation $1,000,000 Per Person/Per Occurrence $500,000 Each Per Statutory Amount CIORBA shall file with the VILLAGE a Certificate of Insurance showing complete coverage of all insurance required, signed by the insurance companies or their authorized agents. Each certificate shall provide that the coverage shall not be terminated without 30 days advance written notice to the VILLAGE except for 10 days notice for cancellation due to non-payment. CIORBA shall name the VILLAGE as an additional insured for general liability and automotive liability for limits stated above. ENGINEER shall require all subcontractors and subconsultants to carry insurance in the amounts stated above. 7. As per Exhibit A, CIORBA will attend conferences and will visit the site of the work at any reasonable time when requested to do so by the VILLAGE. All studies, reports, plans, contract documents and estimates to be furnished by CIORBA, pursuant to this AGREEMENT, will be in accordance with current standard specifications and policies of the VILLAGE. It is understood that all such studies, reports, plans, contract documents and estimates shall, before being finally accepted, be subject to the approval of the VILLAGE. 9. All plans and other documents furnished by CIORBA pursuant to this AGREEMENT will be endorsed by CIORBA and show the requisite professional seal where such is required by law. 10. CIORBA shall perform its services consistent with the prevailing practices and customs of like firms performing similar services. CIORBA shall be responsible for the accuracy of its own services and shall promptly make necessary revisions or corrections resulting from its errors or negligent acts without additional compensation for such services. Acceptance of the Work by the VILLAGE will not relieve CIORBA of the responsibility for subsequent corrections of any such errors or omissions or for clarification of any ambiguities. Basic Agreements of The Village 1. The VILLAGE'S representative for this project shall be the Director of Public Works or his authorized designee. CIORBA'S designated representative shall be Tony Wolff. Such representatives shall have authority to act on behalf of their respective principals and render decisions efficiently. Either party may change its designated representative by a writing sent to the other. Page 2 of 6 <<7 aorbaG ro u p Revised 04/26/2021 2. The VILLAGE will pay CIORBA for the performance of the contract as follows: On a monthly basis upon receipt of an invoice based on the actual cost of work completed. "Actual Cost" is defined as the direct labor costs associated with the personnel used for the work times a direct labor multiplier of 2.9 to cover profit, overhead, payroll burden and fringe benefits plus direct costs. Direct costs are travel, printing and other out-of-pocket expenses as well as subconsultant costs. Direct costs will be reimbursed to CIORBA at their cost with no additional service charge. If VILLAGE identifies an item in the invoice which appears to be in error, VILLAGE may withhold the amount in question but shall pay the balance of the invoiced amount and provide CIORBA with a statement concerning the questioned item. Alternatively, the VILLAGE may pay the full amount of the invoice, provide a statement of the questioned item, and adjustment, if appropriate, will be made in the next subsequent invoice submitted by CIORBA, all pending further discussion between the parties. Direct labor costs for employees shall be consistent with the hourly rate ranges shown on the attached EXHIBIT B. b. The upper limit of compensation shall not exceed $102,550.35 and is detailed in EXHIBIT B. c. The upper limit of compensation may be increased or decreased by subsequent agreement between the contractual and approving parties in writing with signatures by both the VILLAGE and CIORBA if there is a major change in the scope, character or complexity of the work. 3. The VILLAGE agrees to furnish CIORBA with all available plans, utility atlases and survey data useful to the work to be done by CIORBA. CIORBA shall have the right to rely on the accuracy of any information provided by the VILLAGE or VILLAGE consultants. CIORBA shall not be responsible for the acts or omissions of the VILLAGE's other consultants, or any other person or entity performing work on the PROJECT who are not under the direct control or authority of CIORBA. 4. The VILLAGE agrees that, should the VILLAGE require Extra Work, the VILLAGE will pay CIORBA for such Extra Work on the basis of his actual costs - "actual cost" being defined in paragraph 2.a. of the BASIC AGREEMENTS OF THE VILLAGE. Extra Work is defined as any engineering services required beyond the Scope of Services listed in paragraph 4 of the BASIC AGREEMENTS OF CIORBA. The maximum compensation for Extra Work shall be an amount mutually agreed to by the VILLAGE and CIORBA. Extra Work shall not commence until written authorization is received from the VILLAGE. Notwithstanding the foregoing, should CIORBA receive subpoenas or be subject to court orders arising from the Work, CIORBA shall upon notice to the VILLAGE be compensated for compliance with said subpoenas or orders by VILLAGE at CIORBA's then prevailing hourly rates. 5. That, should the VILLAGE require changes in any of the detailed reports, studies or estimates except for those required pursuant to paragraph 10 of the BASIC AGREEMENT OF CIORBA, after they have been approved by the VILLAGE, the VILLAGE will pay CIORBA for such changes on the basis of his actual costs - "actual cost" being defined in paragraph 2.a. of the BASIC AGREEMENTS OF THE VILLAGE. The maximum compensation for these changes shall be an amount mutually agreed to by the VILLAGE and CIORBA. It is understood that "changes" as used in this paragraph shall in no way relieve CIORBA of his responsibility to prepare the work completely and adequately to the reasonable satisfaction of the VILLAGE. General Conditions 1. This contract shall constitute the entire agreement and understanding by and between the parties hereto, and it shall not be considered modified, altered, changed or amended in any respect unless done so in writing with signatures by both the VILLAGE and CIORBA. Page 3 of 6 Revised 04/26/2021 <<.7ciorbaGroup 2. The VILLAGE and CIORBA each binds himself and his partners, successors, executors, administrators and assigns to the other party of this Agreement and to the partners, successors, executors, administrators and assigns of such other party, in respect to all covenants of this Agreement. Nothing herein shall be construed as creating any personal liability on the part of any officer or agent of any public body, which may be a party hereto. Both VILLAGE and CIORBA agree that neither shall take any action to assert any claims or lawsuits against an individual officer, employee, agent, owners of the other. This AGREEMENT shall not be construed as giving any rights or benefits hereunder to anyone other than the VILLAGE and CIORBA. No third party beneficiaries are created by this AGREEMENT. 3. Copies of tracings, plans, reports, estimates, maps, survey notes, computations, electronic data files and other documents prepared by CIORBA in accordance with this AGREEMENT shall upon request be delivered to the VILLAGE per Exhibit A. 4. That none of the services to be furnished by CIORBA, other than those shown in EXHIBIT A, shall be sublet, assigned, or transferred to any other party or parties without written consent of the VILLAGE. The consent to sublet, assign or otherwise transfer any portion of the services to be furnished by CIORBA shall not be construed to relieve CIORBA of the responsibility for the fulfillment of this AGREEMENT. CIORBA assumes no responsibility for the detection or removal of any hazardous substances found at the job site. 6. CIORBA shall have right of access to the project site whenever work is in progress. 7. Any difference between CIORBA and the VILLAGE concerning their interpretation of the provisions of this AGREEMENT shall, before any litigation is commenced, be referred to a mediation committee as a condition precedent to litigation. The committee shall consist of one member appointed by CIORBA, one member appointed by the VILLAGE and a third member appointed by the two other members. This AGREEMENT may be terminated by the VILLAGE upon giving notice in writing to CIORBA at his last known post office address. Upon such termination, CIORBA shall cause to be delivered to the VILLAGE all surveys, permits, agreements, reports, drawings, partial and completed estimates and data, if any from soil survey and subsurface investigations with the understanding that all such material becomes the property of the VILLAGE subject to CIORBA retaining all intellectual property rights including common law, statutory, copyright, and other reserved rights in the instruments of service. 9. The VILLAGE agrees that, should the Project or any part thereof be abandoned or terminated at any time after CIORBA has performed any part of the services provided for in this AGREEMENT; and prior to the completion of such services, the VILLAGE shall reimburse CIORBA for his actual costs, incurred up to the time he is notified in writing of such abandonment or termination, actual cost being defined in paragraph 2.a. under 'BASIC AGREEMENTS OF THE VILLAGE". 10. In accepting and utilizing any drawings, reports, documentation and other technical submissions (in any form including electronic media) generated and furnished by CIORBA, the VILLAGE agrees that these are all instruments of service of CIORBA, who shall be deemed the author, and shall retain all common law, statutory law and other rights, including copyrights. The VILLAGE agrees not to reuse any drawings, reports, documentation and other technical submissions (in any form including electronic media), in whole or in part, for any purpose other than for the Project. The VILLAGE agrees not to transfer the drawings, reports, documentation and other technical submissions (in any form including electronic media) to others without the prior Page 4 of b <<.7 CiorbaG rou p Revised 04/26/2021 written consent of CIORBA. The VILLAGE further agrees to waive all claims against CIORBA resulting in any way from any unauthorized changes to or reuse of any drawings, reports, documentation and other technical submissions (in any form including electronic media) for any other project by anyone other than CIORBA. In addition, the VILLAGE agrees, to the fullest extent permitted by law, to indemnify and hold harmless CIORBA, its officers, directors, employees and subconsultants against all damages, liabilities or costs, including reasonable attorneys' fees and defense costs, arising from any changes made by anyone other than CIORBA or from any unauthorized reuse of any drawings, reports, documentation and other technical submissions (in any form including electronic media) without the prior written consent of CIORBA. Under no circumstances shall delivery of any drawings, reports, documentation and other technical submissions (in any form including electronic media) for use by the VILLAGE be deemed a sale by CIORBA, and CIORBA makes no warranties, either express or implied, of merchantability and fitness for any particular purpose. In no event shall CIORBA be liable for indirect or consequential damages as a result of the VILLAGE'S reuse of the any drawings, reports, documentation and other technical submissions (in any form including electronic media). Nothing contained herein shall create a contractual relationship with, or any rights in favor of, any third party, including any contractors, subcontractors, design professionals, or subsequent users. 11. Electronic files furnished by either party shall be subject to an acceptance period of 30 days during which the receiving party agrees to perform appropriate acceptance tests. Ciorba shall correct any discrepancies or errors detected and reported within the acceptance period. After the acceptance period, the electronic files shall be deemed to be accepted and Ciorba shall have no obligations to correct errors or maintain electronic files. The VILLAGE is aware that differences may exist between the electronic files delivered and the printed hard -copy construction documents. In the event of a conflict between the signed construction documents prepared by CIORBA and electronic files, the signed or sealed hard -copy construction documents shall govern. 12. This AGREEMENT and the enforcement therefore shall be governed, construed and controlled in all respect by the laws of the state where the Project is located. Page 5 of 6 Revised 04/26/2021 <<.70orbaGroup IN WITNESS WHEREOF, the parties have caused this AGREEMENT to be executed on the date first above written. Executed by the: Village of Deerfield of the State of Illinois, acting by and through its Board of Trustees. By: it age President Name: Daniel C. 5�akplro Date: ko Li Z02 Ciorba Group, Inc. By: 01'kD Name: Duane O'Laughlin Title: Chief Operating Officer Date: 9/23/2022 ATTEST: 4--v— Village Ckerk Name: �r 2' f 7 - Date: IC --S"- Zo zrZ ATTEST: Name: Melissa Bentz Title: Corporate Secretary Date 9/23/2022 Page 6 of 6 aorbaG rou p Revised 04/26/2021 << Exhibit A Scope of Services WATER INTERCONNECT TRANSMISSION MAIN ROUTING STUDY AND SURVEY This scope of services includes preliminary engineering services, including a routing study and topographic survey, for the design of approximately two miles of 16" water transmission main connecting the recently constructed water interconnection between the Villages of Deerfield and Northbrook under the Edens Spur to the Village of Deerfield's Mitchell Park Reservoir and Pump Station. The following are the primary tasks: 1. Meetings, Data Collection and Coordination a. Attend an initial kickoff meeting with the Village to review the proposed scope of improvements, engineering parameters, and project schedule. Copies of standard Village specifications and details, and public utility atlases will be obtained during this meeting. An additional meeting will be scheduled with the Village to review the concept water main alignment. b. Obtain private utility atlases for identification of potential conflicts. 2. Water Transmission Main Alignment Study & Pump Station Assessment a. Ciorba will review the water transmission main alignment proposed by the Village to identify any potential obstacles or proposed modifications. This review will include assessment of potential utility conflicts, property ownership issues, permitting requirements, constructability, long-term maintenance, and cost optimization. Additional potential criteria for evaluation will be discussed with the Village at the kickoff meeting. b. Ciorba will evaluate the connections to the existing pump station and determine necessary improvements to yard piping outside of the station. It is assumed that any interior pump station work is outside of the scope of this contract. It is further assumed that yard piping work will be based on input from the Village or studies provided by the Village. c. The Village will provide its water system model for Ciorba's use during the water main alignment and pump station assessments. The Village will also facilitate coordination with the Village of Northbrook to obtain modeling output of their system in order to assess interconnection performance. d. Ciorba will perform a hydraulic analysis of the final interconnection routing to identify any additional improvements required in the Village of Northbrook or the Village of Deerfield in order to achieve appropriate interconnection pressures and flows. These supplemental improvements will be summarized in a Technical Memo for the Village's review. Types of improvements may include a booster pump station and an interconnection meter / backflow prevention vault. The interconnection valve vault, including valves and metering, for the 1 <(7 CiorbaGroup (OYSp�Tlp4 Ep 4�NEFpS connection to Northbrook's system is included in this scope of work. Design of a booster pump station is not included but can be provided by Ciorba Group as an additional service. 3. Title Searches a. The water main will be designed within the ROW, Village owned property, or existing easements if possible. However, conditions may exist that could require easement acquisition for the final alignment of the transmission main. Ciorba Group has included Ridgeline Consultants on the project team to conduct three title searches during this preliminary engineering phase. 4. Topographic Survey a. Full horizontal and vertical topographic survey will be completed for the entire project length with work beginning soon after agreement with the Village on a proposed water main alignment. Survey tasks will include setting horizontal and vertical control and obtaining utility information such as manhole invert elevations and conditions. Collecting storm sewer and sanitary sewer manhole inverts will be important to identify potential conflicts with the proposed water main. A tree survey of all trees with a diameter over 6-inches will also be completed. Besides obtaining the topographic features in the project area, the survey will establish the centerline alignment of the existing pavement. Property corners will be surveyed if found during the normal survey process and will be used to cross-check GIS right of way shape files provided by the Village. Once the survey is completed, the topographic data will be used to develop base sheets for the design plan preparation. A Digital Terrain model will also be developed to create an existing ground profile over the water main. 2 <�; aorbaGroup 000000 0 M O N 00 N 0 In O OR N O O M M M C. LL O Z a 7 c IS H Lno o o o o LO O (0 CO O M O J W M 7 LO O W V V co I-- 0 0 0 LO a t V N L(J O W L•O Ln O+ O OV M M NO H U �Eacflcfldssv � U) o 0 W U CD O U M fM LLJ > m W Cl) M uw 0 co CR EH Lq oo UO U °° rn LU to p coo oU co o LO W COOaoo oqq J C660o400 v H O MM Ln O O N + a N fA 64 fR Efl fA ffl O O O O O O L00000 Ln J J r-cco r(00n 7 0 Ln N m M M Lc } m M V M M a a 6%6-1��69. 6�y LO 00 N LO a o � _ a w w ea o_ E 7 H U Z E n 'w R 2 N N O N 0 W H Z_ Of a STAFF HOURS Village of Deerfield Water Interconnect Transmission Main Routing Study and Survey d M R u m 'm W ° d O `o N C C W a a 2 C ~ 2 ae ~> Grand lu u m c as o r r y c Total ° a` y ° Q. w to H u m 675 27 117 25 109 71 278 48 t. Meetings, Data Collection & Coordination Task Total: 55 11 23 5 9 7 olo Meetings Subtotal: 27 9 9 3 3 3 Meetings with Village - 2 s 4 a Meetings with Other Agencies - 1 4 2 2 Meetings with Project Team (3 month duration) 15 3 3 3 3 3 o11 Coordination Subtotal: 24 2 12 2 4 4 Coordination with Village 5 1 4 Coordination with Other Agencies 2 2 Coordination with Project Team 7 1 4 2 Coordination with Utilities 10 2 4 4 012 Data Collection Subtotal: 4 2 2 Field Checks 4 2 2 2. Topographic Survey Task Total: 328 2 1 278 48 02o Field Survey Subtotal: 284 2 234 48 Project Setup 4 2 2 Establish Control Points and Ties 72 48 24 Horizontal Topography 144 144 Supplemental Survey 16 16 Drainage Utility Structure Inventory 48 24 24 o21 Process Survey Information Subtotal: 44 44 Base Sheet Development 20 20 Create Digital Terrain Model 24 24 N:1Cont.a tl k0021368.01\C.t,act_W.rksh.tsXNegoUationskRouting StudyICECS Water Interwn—t Transmission Main Routing Study and Suwey.bsm St Work Breakd� , C i o rba G ro u p own ructure Vanc_ 2 ni S STAFF HOURS Village of Deerfield Water Interconnect Transmission Main Routing Study and Survey d r � `a c rsn m m 16 w u m a` c W d m a m � e aui F m .�c ~ ? Grand u E c 'rn e `o L u m rn a Total a y a to c m m 3. Water Resources Task Total: 272 88 20 100 64 032 Water Main System Subtotal: 180 44 20 76 40 Water System Demand Projections 6 2 4 Water System Capacity Analysis 26 10 16 Water Main Preliminary Design 76 24 8 28 16 Water Main Sheets 72 8 12 28 24 034 Reports / Location Drainage Studies Subtotal: 92 44 24 24 Water System Report 92 44 24 24 4 6. QC/QA Task Total: 4 090 QC/QA Subtotal: 4 4 Water Resources 4 4 7. Project Management & Administration Task Total: 16 12 4 too Project Management & Administration Subtotal: 16 12 4 Project Administration 8 3 Project Management 8 4 4 N:1Contracts1002136B.011Contraot_WorkshcetalNegotiations%Routing StudyICECS Water Interconnect Transmission Main Routing Study and Suwey.dsm C i o r ba G ro u p Work Breakdovm Structure n�+n�� Panty i of 5 <<70orbaGroup CONSULTING ENGINEER FIRM NAME PRIME/SUPPLEMENT Client Ciorba Group, Inc. Prime Village of Deerfield ESCALATION FACTOR 0.00% CLASSIFICATION CURRENT RATE ESCALATED RATE Project Manager $90.00 $90.00 Senior Project Engineer $73.00 $73.00 Project Engineer $57.00 $57.00 Engineer II $42.00 $42.00 Engineer 1 $34.50 $34.50 Senior Technician $44.50 $44.50 Technician $36.50 $36.50 DATE 09/09/22 Printed 9/9/2022 2:20 PM IN-HOUSE DIRECT COSTS Village of Deerfield Water Interconnect Transmission Main Routing Study and Survey PHASE Meetings, Data Collection & Coordination Description Unit Unit Cost Quantity Extended Cost Vehicle (mileage) mile $ 0.575 140 $ 80.50 Total: S 80.50 Topographic Survey Description Unit Unit Cost Quantity Extended Cost Vehicle (day) day $ 65.00 29 $ 1,885.00 Total: S 1,885.00 CiorbaGroup CECS Water Interconnect Transmission Main Routing Study and Survey.xlsm: InHouseDC CONSULTING ENGINEERS