R-22-37VILLAGE OF DEERFIELD RESOLUTION NO. 2022- R-22-37 A RESOLUTION APPROVING AN AGREEMENT WITH CONCENTRIC INTEGRATION, INC. OF CRYSTAL LAKE, ILLINOIS FOR SCADA IMPROVEMENT SERVICES WHEREAS, the Village of Deerfield ("Village's is a home rule municipality in accordance with Article VII, Section 6 of the Constitution of the State of Illinois of 1970; and WHEREAS, the Village desires to retain a firm to provide contracting services for SCADA Improvement Services ("Services'); and WHEREAS, the Village received proposals from Concentric Integration, Inc. of Crystal Lake, IL ("Consultant") to provide the Services; and WHEREAS, the Village and Consultant desire to enter into an agreement for the provision of the Services by Consultant ("Agreement'); and WHEREAS, the Mayor and Board of Trustees have determined that entering into the Agreement with Consultant will serve and be in the best interest of the Village and its residents; NOW, THEREFORE, BE IT RESOLVED BY THE VILLAGE BOARD OF DEERFIELD, LAKE AND COOK COUNTIES, ILLINOIS, as follows: SECTION 1: RECITALS. The Village Board hereby adopts the foregoing recitals as its findings, as if fully set forth herein. SECTION 2: APPROVAL OF AGREEMENT. Pursuant to the Village's home rule authority, the Agreement by and between the Village and Consultant is hereby approved in substantially the form attached to this Resolution as Exhibit A, and in a final form and substance acceptable to the Village Manager and the Village Attorney. SECTION 3: AUTHORIZATION TO EXECUTE AGREEMENT. The Mayor and the Village Clerk are hereby authorized and directed to execute and attest, on behalf of the Village, the final Agreement upon receipt by the Village Clerk of at least one original copy of the final Agreement executed by Consultant; provided, however, that if the executed copy of the final Agreement is not received by the Village Clerk within 60 days after the effective date of this Resolution, then this authority to execute and attest will, at the option of the Mayor and Board of Trustees, be null and void. SECTION 4: EFFECTIVE DATE. This Resolution shall be in full force and effect from and after its passage and approval according to law. [SIGNATURE PAGE FOLLOWS] {00124077.1 } AYES: Benton, Berg, Jacoby, Metts-Childers, Oppenheim NAYS: None ABSTAIN: None ABSENT: Seiden PASSED: June 20, 2022 APPROVED: June 20, 2022 RESOLUTION NO: R-22-37 Daniel C. Shapiro, Mayor ATTEST: Kent S. Street, Village C erk {00124077.1 } EXHIBIT A Agreement {00124077.11 C141 Project Proposal CONCENTRIC I N T E G R A T I O N May 23, 2022 Mr. Tyler Dickinson Assistant Village Engineer Village of Deerfield 465 Elm St Deerfield, I L 60015 Subject: 2022 SCADA Improvements Concentric Project Number: 220084.50 Dear Mr. Dickinson: The Village's existing SCADA system has a variety of areas requiring improvements to provide a more resilient and functional system. Concentric Integration provided a SCADA system assessment in 2021 which consisted of reviewing the existing SCADA system and discussion with Village staff to better understand their needs, which resulted in a number of recommended improvements. Following is our proposal for providing these improvements based on the SCADA assessment, discussions and meetings. Scope of Services General Project Mang ement 1. Plan, schedule, and coordinate the activities that must be performed to complete the Project. 2. Coordinate and attend project kick-off meeting. 3. Provide monthly project status updates via email and discuss status with the Customer's Project Manager. SCADA Software Improvements General This scope item consist of replacing the existing GE iFix SCADA software with Inductive Automation Ignition. This includes complete graphic redevelopment using high performance HMI graphic styling and input from Village staff. The existing WIN-911 alarming software will be removed and will use Ignition's alarming notification software module. A VoIP PBX device will be included to allow voice notifications using a standard phone line. Software Licensing Provide the following software licensing: 1. Quantity (1) license of Inductive Automation Ignition with the following: 8678 Ridgefield Rd., Crystal Lake, IL 60012 • 815-788-3600 • www.goconcentric.com e CONCENTRIC INTEGRATION a. Perspective visualization module with four client licenses b. Tag Historian module c. Alarm Notification module with Voice notification module d. Allen-Bradley driver suite e. One year of BasicCare support Concentric Provided Equipment Provide the following equipment: 1. Quantity (1) Yeastar S20 VoIP PBX with phone module. Village Provided Services Village will provide the following: 1. Provision the following virtual servers on Village's existing Virtual Host server - a. SCADA/Alarming Server b. SCADA SQL Server Labor 1. Install Ignition SCADA software on SCADA computer. 2. Develop SCADA graphics to provide a more intuitive, user-friendly, and functional system. 3. Coordinate and attend initial graphic development meeting to determine general nature of graphic requirements with input from Village staff prior to starting development. 4. Develop conceptual graphics after first meeting for Village staff review, then proceed with final development after agreement with the Village regarding the conceptual graphic design. 5. Confer will Village staff throughout the development process to ensure new graphics meet Village staff expectations. 6. Configure the Ignition SCADA software to provide voice notification for alarms similar to the current function of WIN-911, which will be replaced. 7. Configure Yeastar VoIP PBX device to allow operation with the new SCADA computer for providing phone notification for alarms. 8. Configure up to four Village -provided mobile devices to allow SCADA remote access. 9. Provide up to 8 hours of training on using the new SCADA graphics. Project # 220084.50 Page No. 2 e I! CONCENTRIC INTEGRATION Pump Stations & Booster Station Control Improvements General This scope item consist of reprogramming Richfield Pump Station, Mitchell Pump Station, Hawthorne Pump Station, North Feed Booster Station, Elevated Tank, and Primary PLC at Public Works to a consistent and standard programming style. Control improvement recommendations will be discussed with Village staff and included in the reprogramming. Labor 1. Coordinate and attend initial control system improvement meeting to determine Village staff requirements for new controls. 2. Provide Operational Description write-up that includes how the control system will operate. Village and Concentric will use this as a baseline for reprogramming. 3. Provide PLC programming for each of the PLCs. Programming will include migrating portions of the existing programs as well as enhancing the programs using Studio5000 features such as tag -based addressing and Add -On Instructions (AOIs) for repetitive routines. Communication programming will also be improved to reduce the amount of traffic on the cellular network. 4. Provide data mapping to existing OITs. Existing OIT graphics will not be modified. 5. Provide programming for new VFD at Mitchell Pump Station. 6. Test 1/0 and logic functions at each site. Mitchell Pump Station Pump 3 & 4 Variable Frequency Drive (VFD) General This scope item consist of adding a packaged 100HP VFD with output contactors for two motors. Equipment Provide the following equipment: 1. Quantity (1) Allen-Bradley Custom Packaged 100HP PowerFlex 755TL Drive consisting of the following: a. PowerFlex 755TL which provides harmonic mitigation to help reduce energy costs b. Output contactors for two motors c. Door mounted HIM, Start Push Button, Stop Push Button, Motor Selector Switch Project # 220084.50 Page No. 3 C11an CONCENTRIC INTEGRATION d. NEMA 12 Enclosure, approximately 87"H x 56"W x 24"D 2. Quantity (2) Allen-Bradley 200A Disconnects 3. Quantity (1) Westinghouse FZF1Q18 200A Freedom Breaker 18" Labor 1. Extend housekeeping pad for installation of VFD. 2. Install VFD. 3. Remove existing MCC starter bucket and replace with MCC breaker bucket. 4. Furnish and install conduit and wire to power VFD. 5. Modify existing conduits and install wiring to pumps 3 & 4. 6. Install conduit and control wiring to SCADA panel. 7. Install (2) 200A disconnects, one at each pump. 8. Provide VFD configuration, startup and testing to confirm proper operation. Fee Our fee for the above scope will be computed on the basis of hourly billing rates for actual work time performed plus reimbursement of out-of-pocket expenses including travel costs, which total amount will not exceed $206,410. This proposal is valid for 90 days from the date issued. Concentric Assumptions / Customer Responsibilities 1. Customer will assign an initial project manager at the project kickoff meeting. 2. Customer will provide site access for installation, programming, and startup during Customer's normal business hours. Work outside of Customer's normal business hours can be agreed upon as needed, provided Concentric can secure the site(s) upon departure. 3. Customer understands that all existing equipment to remain is assumed to be in good, working order. In the event that any other equipment does not perform as -expected, Concentric will work with the Customer to repair, as -needed, under a separate contract. 4. Customer will dispose of/recycle any removed equipment. Project # 220084.50 Page No. 4 411ii CONCENTRIC INTEGRATION 5. Customer understands that software/materials purchased outside Concentric may require regular support, and it will coordinate directly with the manufacturer to identify support costs for future budgeting purposes. Annual Support This project will add additional hardware and software to the Customer, some of which has support or maintenance associated with it. Concentric recommends the Customer maintain any applicable support agreements once the initial support/warranty periods expire. On this project, we have included the following support agreements, that all begin approximately at the date the product is shipped (not necessarily the date it is onsite) and last for periods varying from one year to three years. Following is the recommended support and estimated amounts for annual renewals (this is provided solely for budgetary purposes and will need to be quoted at the time of renewal): Description Annual Renewal Ignition Basic Care $2,860 Manufacturer standard warranty on all other hardware Project Schedule Mitchell Pump Station VFD lead time is approximately 20 weeks after acceptance of order, subject to change based on manufacturer's ability to supply the equipment. Concentric is available to begin work upon notice to proceed Wa rra my The warranty listed in the Standard Terms and Conditions (Paragraph 12.2). ❑X DOES apply ❑ DOES NOT apply Standard Terms and Conditions References Effective Date: The Effective Date of this Proposal and the associated Standard Terms and Conditions shall be the date this Proposal is accepted as shown by Customer's dated signature below. Third Party Materials (See Standard Terms and Conditions Paragraphs 3.2 & 8.3): Project # 220084.50 Page No. 5 411 CONCENTRIC INTEGRATION ❑X DOES apply ❑ DOES NOT apply Notices: Notices required to be provided to Customer in accordance with Paragraph 16.3 of the Standard Terms and Conditions shall be delivered to the individual and address given above, unless Customer provides updated notification information to Concentric in writing Standard Terms and Conditions Concentric Integration, LLC's Standard Terms and Conditions, Version 10 (V10), located at http://goconcentric.com/standard-terms/ are hereby incorporated into this Project Proposal as though fully attached hereto. By signing below, each of the undersigned represents and warrants that Concentric Integration, LLC's Standard Terms & Conditions are legal, valid and binding obligations upon the parties for which they are the authorized representative. Project # 220084.50 Page No. 6 0k it CONCENTRIC INTEGRATION Acceptance If this proposal is acceptable, please sign one copy and return to us. Feel free to contact me if you have any questions. Sincerely, CONCENTRIC INTEGRATION, LLC A Michael D. Klein, PE President MDK CUSTOMER: VILLAGE OF DEERFIELD ACCEPTED BY:% TITLE: DATE: �JVYIe L,� �Q2 P:\DRFDV\220084-SCADAIM PROVEM ENTS2022\10-1 N ITIATI O N\220084PROPOSAL-SCADAI M PROVE M ENTS.DOCX Project # 220084.50 Page No. 7