Loading...
R-17-06VILLAGE OF DEERFIELD LAKE AND COOK COUNTIES, ILLINOIS RESOLUTION NO. R -17 -6 RESOLUTION AUTHORIZING WORK ACCELERATION FOR THE RESURFACING AND RECONSTRUCTION OF DEERFIELD ROAD (PROJECT NUMBER M -9003 ((854)) WHEREAS, the Village is the lead local public agency for Project Number M -9003 (854), which is a project for the resurfacing and reconstruction of Deerfield Road for a length of approximately 2.39 miles from the Metra viaduct to U.S. Route 41 in the City of Highland Park, (the "Project'); and WHEREAS, work acceleration cost for the project are to be borne by the Village of Deerfield as the lead agency. Such work acceleration costs are an additional cost to the contract and are non - participating. WHEREAS, work acceleration includes but is not limited to premium time work, the stage 2 out of sequence work, night work, and winterization of the project limits totaling approximately $550,000. NOW THEREFORE, BE IT RESOLVED BY THE PRESIDENT AND BOARD OF TRUSTEES OF THE VILLAGE OF DEERFIELD, LAKE AND COOK COUNTIES, ILLINOIS, in the exercise of its home rule powers, as follows: SECTION 1: That the above and foregoing recitals are hereby incorporated and made a part of this Resolution as if fully set forth herein. SECTION 2: The Acceleration work outlined by the attached BC -2256 for dated September 1, 2016 attached hereto and made a party hereof is hereby approved. SECTION 3: The Village President and Village Clerk are hereby authorized and directed to respectively execute the Acceleration work for and on behalf of the Village of Deerfield. SECTION 4: That The Village of Deerfield hereby appropriates Five Hundred and Fifty Thousand and 00 /100 Dollars, or as much as may be need to cover costs for acceleration work in the completion of MFT Section Number 1 1- 00092 -00 -PV SECTION 5: That this Resolution shall be in full force and effect from and after its passage and approval as provided by law. PASSED this 6th day of March , 2017. AYES:Farkas, Jester, Nadler, Shapiro, Struthers NAYS: None ABSENT: Seiden ABSTAIN: None APPROVED this 6th day of March 2017. ATTEST: I4 I . L&--' Village Clerk -2- 4 -X � Village Presi ent